
MRK-D-0034 V2.0
Aeroqual AQM 65 User Guide
Page | 62
4.4.6.2
Leak check a Particle Profiler
1. Fully open the sample valve
2. Disconnect the purge line and cap the purge line and purge port as shown in Figure 4-15
3. Remove the TSP inlet and place the vacuum gauge on the inlet
4. Wait for the vacuum gauge to stabilise
5. Remove black and red power cable from electronics box
Figure 4-15 Cap the purge and exhaust lines. Place the vacuum gauge on the inlet. Disconnect the power,
observe the change in pressure.
NOTE:
The pressure change (leak rate) should be no more than 10 kPa in 10 seconds