Chapter 8 The High Capacity HiveManager
84
Aerohive
R
ACK
M
OUNTING
THE
H
IGH
C
APACITY
H
IVE
M
ANAGER
Use the rack mounting kit to mount the High Capacity HiveManager in a standard 19" (48 cm) equipment rack.
The rack mounting kit contains the following items:
•
(2) slide sets (each consisting of an outer slide, inner slide, and chassis rail)
•
(2) rear mounting brackets
•
(4) bar nuts
•
(4) locator pins
•
(6) slot-head machine screws with 8-32 threads – for attaching the mounting brackets to the outer
slides
•
(14) cross-head machine screws with 10-32 threads – for attaching the chassis rails to the
HiveManager, and the front and the rear mounting brackets to equipment rack rails with tapped holes or
to the enclosed bar nuts when the rack rails have round holes
1. After checking that the mounting kit contains the above parts, separate the chassis rails from each slide
set, as shown in
.
Figure 2 Separating the chassis rail from the nested slides
2. Position one of the chassis rails so that the slide stop is near the HiveManager mounting bracket near the
front panel and the front and rear holes in the chassis rail align with the holes in the side of the
HiveManager. Use three of the cross-head screws to secure the chassis rail to the HiveManager chassis as
shown in
.
Because of the weight of the device (34 lb./ 15.42 kg without rails), two people are required to rack mount
it safely.
Outer slide
Inner slide
Chassis rail
Extend the telescoping pieces of
the slide set to the left and right.
Outer slide
Inner slide
Chassis rail
Swivel the catch to release the chassis
rail, and then slide it compleletely away
from the nested slides.
Turn over
Catch
Summary of Contents for Aerohive APs
Page 1: ...Aerohive Hardware Reference Guide ...
Page 7: ...Contents 6 Aerohive ...
Page 17: ...Chapter 1 The AP330 and AP350 Platforms 16 Aerohive ...
Page 47: ...Chapter 3 The AP320 Platform 46 Aerohive ...
Page 61: ...Chapter 4 The AP170 Platform 60 Aerohive ...
Page 91: ...Chapter 8 The High Capacity HiveManager 90 Aerohive ...