12
V.
MAINTENANCE SCHEDULE
The Programmable Bi-directional Booster Amplifier is designed for unattended
operation requiring minimal maintenance. General maintenance consists of equipment
inspection an operational tests. Periodical equipment tune-up and alignment is
recommended.
Cable Inspection:
The external and internal cables and connectors should be checked for
indication of corrosion.
Enclosure Inspection:
The interior of the enclosures should be inspected for evidence of
condensation.
LED Inspection:
Power LED: ON
Status LED: Flashing at a rate of 1Hz
Com LED:
OFF
The performance of operations testing is recommended to be done bi-yearly.
Operational testing will indicate equipment status determining if an alignment is
necessary.