![AERMEC NRP 0800 Technical Manual Download Page 7](http://html.mh-extra.com/html/aermec/nrp-0800/nrp-0800_technical-manual_2862067007.webp)
3.
BASIC OPERATING LAYOUTS FOR 2 PIPE SYSTEM
3.1.
COLD WATER PRODUCTION ONLY TO SYSTEM
3.2.
HOT WATER PRODUCTION ONLY TO SYSTEM
HPT
HPS
LS
VIC
LPT
IDL
CP
CN
CV
CV
CV
CV
CV
TEV
F
AL
VIC
TEV
HPT
HPS
LS
VIC
LPT
IDL
CP
CN
CV
CV
CV
CV
CV
TEV
F
AL
VIC
TEV
HPT
HPS
LS
VIC
LPT
IDL
IDL
CP
CN
CV
CV
CV
CV
CV
TEV
F
AL
VIC
TEV
HPT
HPS
LS
VIC
LPT
CN
CV
CV
CV
CV
CV
TEV
F
AL
VIC
TEV
CP
ĞƐĐƌŝƉƟŽ
n
Opera
ƟŽŶ
1
SYSTEM SIDE heat
exchanger
(EVAPORATION)
Cold water pr
ŽĚƵĐƟŽŶ
2
DHW SIDE heat
exchanger
not running
3
SOURCE SIDE heat
exchanger
(CONDENSATION)
Heat exchange with air
ĞƐĐƌŝƉƟŽ
n
Opera
ƟŽŶ
1
SYSTEM SIDE heat
exchanger
(CONDENSATION)
Hot water pr
ŽĚƵĐƟŽŶ
2
DHW SIDE heat
exchanger
not running
3
SOURCE SIDE heat
exchanger
(EVAPORATION)
Heat exchange with air
H
2
O SYSTEM
RETURN
H
2
O SYSTEM
RETURN
H
2
O SYSTEM FLOW
H
2
O SYSTEM FLOW
1
2
3
3
1
2
3
3
2
Key
1
System side heat exchanger
2
DHW side heat exchanger
3
Source side heat exchanger
AL
Liquid storage tank
CV
One-way valve
F
Dehydrat
ŽƌĮů
ter
IDL
Liquid indicator
HPT
High pressure transducer
HPS
High pressure switch
LPT
Low pressure transducer
LS
Liquid separator
TEV
Thermosta
ƟĐ
valves
VIC
Cycle reversing valves
5.
BASIC OPERATING LAYOUT FOR 2 PIPE SYSTEM
7
INRP260HzTY. 1312. 5806717_03