background image

USER MANUAL 

EarthGuard – EG-300 

Australian Energy Research Labs 

AER013 – Rev 1.1 

21st July 2020

 

AER013 REV 1.1 

 
 

 

 
 
 

Thanks for supporting local manufacturing with your purchase of an Australian designed and

 

made 

product. 

 

Product Description 

 

Utilizing proprietary detection techniques, the AERL EarthGuard Insulation Monitoring Device 
simultaneously monitors the unearthed PV Array (60 - 300V) and Battery Storage System (48/120V) for 
conductor insulation degradation.  
 
Installed on the battery bus, the EarthGuard monitoring device satisfies the earth fault detection 
requirements of both AS/NZS 5033:2014 & AS/NZS 5139:2019 with onboard audio/visual alarms and an 
alarm relay output for external fault indication.  
 
Featuring support for full integration with AERL’s CoolMax SRX charge controller range, EarthGuard can be 
utilized in an integrated arrangement or as a standalone device for use with approved third-party 
controllers, power conversion equipment and battery systems.

 

 

Firmware 

 

This installation and operation manual covers EarthGuard Firmware Revision v1.1. 
 

Supported System Components 

 

All 

AERL 

products have been tested for compatibility with the EarthGuard EG-300 but some third-party 

products may internally exceed the maximum allowed leakage tolerated by the EarthGuard, causing the 
device to immediately trigger. 
 
 
Please refer to the list below for supported third-party Controllers, PCE and Battery Inverters. 
 

Selectronic SP Pro Series 1, 2 & 2i 

Victron SmartSolar MPPT Series 

Victron BlueSolar MPPT Series 

Victron MultiPlus 

Victron MultiPlus II & II GX 

Victron Quattro Series 
 

Products listed below are 

incompatible

 with EarthGuard and cannot be installed in systems requiring 

compliance with AS/NZS 5033:2014 & AS/NZS 5139:2019. 
 

Victron EasySolar II GX 
 

Introduction 

 

Summary of Contents for EarthGuard EG-300

Page 1: ...EarthGuard Earth Leakage Detection Installation Operation Manual Models EG 300...

Page 2: ...Solar Micro Hydro Micro Wind and Cathodic Protection applications Contact Information Address Unit 15 1015 Nudgee Rd Banyo QLD 4078 Australia Phone 61 07 3129 0330 Email sales aerl com au Website http...

Page 3: ...t Description 7 Firmware 7 Supported System Components 7 Installation 8 Installation Standards 8 Detection Requirements 8 Mounting the Device 8 Wiring Information 9 Wire and Disconnect Sizing 9 EarthG...

Page 4: ...ual be read before beginning installation Only qualified electricians and technicians should install the EarthGuard This manual is intended for all installation technicians and the system owner Do not...

Page 5: ...quired to disconnect or reinstall faulty parts AERL will pay the cost of freight to return the repaired charge controller to the customer within Australia or New Zealand only The method of freight wil...

Page 6: ...Side EG 300 Input Power 12V Input 10 14 Vdc 12V Nominal Max Power Consumption 12V Input 120mA Input Power 5V Input USB C 4 5 5 5 Vdc 5V Nominal Max Power Consumption 5V Input 290mA Alarm Indication R...

Page 7: ...r range EarthGuard can be utilized in an integrated arrangement or as a standalone device for use with approved third party controllers power conversion equipment and battery systems Firmware This ins...

Page 8: ...and PV Array if the array exceeds 60Vdc That said because the AERL and Victron regulators are not galvanically isolated only a single EarthGuard is required to cover both the array and battery bank d...

Page 9: ...orque all terminal connections to 0 6 Nm 5 in lb To install cabling and configure the device the 4 x M4 CSK Phillips Screws holding the lid in place must be removed When removing the lid gently discon...

Page 10: ...he DC and DC sense wires are at risk of mechanical damage in their installed location appropriately rated in line fusing is highly recommended due to the potential fault currents available from the co...

Page 11: ...while the device is powered down Alarm Indication Relay The EarthGuard features a dry contact signal relay for use with the CoolMax SRX and other external devices such as the Victron Venus GX in order...

Page 12: ...er present After several seconds the All Clear green LED should start blinking if the fault is no longer detected Simulating a Fault If you would like to test the EG 300 has been correctly installed t...

Page 13: ...v 1 1 21st July 2020 13 AER013 REV 1 1 Note The EarthGuard documentation is being improved regularly If the relevant situation is not documented please contact AERL at either support aerl com au or on...

Page 14: ...USER MANUAL EarthGuard EG 300 Australian Energy Research Labs AER013 Rev 1 1 21st July 2020 14 AER013 REV 1 1 Page intentionally left blank...

Page 15: ...USER MANUAL EarthGuard EG 300 Australian Energy Research Labs AER013 Rev 1 1 21st July 2020 15 AER013 REV 1 1 Page intentionally left blank...

Reviews: