AMR Integrated Water Heaters (Supplement to GF-146)
CHAPTER 3: INSTALLATION - SITE
3.7 Vent and Combustion Air Piping
This water heater requires a special vent system, designed for pressurized venting.
The water heater is to be configured for either direct vent installation or for installation using
room combustion air. When room combustion air is considered, see Chapter 6 of the AM Series
User Manual,
GF-146
.
Vent and air may be vented vertically through the roof or out a side wall, unless otherwise
specified. You may use any of the vent/air piping methods covered in Chapter 6 of the AM
Series User Manual,
GF-146
.
Be sure to locate the unit such that the vent and air piping can be routed through the building
and properly terminated.
The vent/air piping lengths, routing and termination method must all comply with the methods
and limits given in Chapter 6 of the AM Series User Manual,
GF-146
.
3.8 Prevention of Combustion Air Contamination
Install air inlet piping for the appliance as described in Chapter 6 of the AM Series User Manual,
GF-146
. Do not terminate vent/air in locations that can allow contamination of combustion air.
WARNING!
Ensure that the combustion air will not contain any contaminants.
Contaminated combustion air will damage the unit, resulting in
possible personal injury, death or substantial property damage.
3.9 Transportation Requirements
•
Only transport the unit using the correct transportation equipment, such as a hand
truck with a fastening belt or special equipment for maneuvering steps.
•
During transportation, the unit must be secured on the transportation equipment to
prevent it from falling off.
•
Protect all parts against impacts during transport.
•
Observe the transportation markings on the packaging.
•
Leave the protective covers on the connections until ready to install.
•
During transportation, cover the flue gas and air intake connections at the top of the
unit with plastic or other material to avoid contamination.
WARNING!
When transporting an AMR Integrated water heater that has been
in previously in operation, ensure that the integrated buffer tank is
either drained or that the extra weight of the filled tank is properly
accounted for when selecting the appropriate transportation
equipment.
Page
16
of
52
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0106_0A
PRI - 07/22/15
Ph.: 800-526-0288
GF-146-IR