
EN
2
2
22
Flue assembly - Mounting the hood body
• Position the upper chimney section and fix the upper part to the
frame using the 2 screws 12c (2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the
lower part to the frame using the 2 screws 12c (2,9 x 6,5) pro-
vided.
Before fixing the hood body to the frame:
• Remove the grease filters from the hood body.
• Remove any activated charcoal filters.
• From below, use the 4 screws 12f (M6 x 10)provided to fix the
hood body to the frame.
12f
12c
12c
ELECTRICAL CONNECTION
• Connect the hood to the mains through a two-pole switch hav-
ing a contact gap of at least 3 mm.
• Remove the grease filters (see paragraph Maintenance) being
sure that the connector of the feeding cable is correctly inserted
in the socket placed on the side of the fan.
• Open the junction box 24 and connect the lights connectors
Lux putting one of them into each box.
• Connect the control connector Cmd putting it in one of the
junction boxes 24.
• Close the junction boxes 24 using the screws provided.
• For the cycling version, fit the charcoal filter.
• Replace the grease filters.
24
12e
Cmd
Lux
24
12e
Lux
Summary of Contents for DI9993-M
Page 7: ...DE 7 7 CHARAKTERISTIKEN Platzbedarf ...
Page 17: ...EN 1 7 17 CHARACTERISTICS Dimensions ...
Page 27: ...NL 2 7 27 EIGENSCHAPPEN Buitenafmetingen ...
Page 37: ...IT 3 7 37 CARATTERISTICHE Ingombro ...
Page 46: ......
Page 47: ......