Installation Instructions
77
Electrical Connection
• Connect the cable harness with the 12 pole compact connector to
the mating connector from the built-cooker or switch box. Please
ensure that the cooking surface connector is inserted vertically from
above in accordance with the numbers 1 – 2 – 3 – 4 and that it
engages securely. Push the connecting cable to the side on the top of
the oven.
1
• Following connection to the mains supply, all cooking zones are to be
switched on, at the maximum setting, one after the other for approx.
30 seconds to check that they function correctly.
Summary of Contents for 11000 M
Page 14: ...Installation Instructions 74 ...
Page 15: ...Installation Instructions 75 ...
Page 16: ...Installation Instructions 76 ...