14
INV315-50EU
11.2019
Standard
given by
utility
company
Display inverter
Meaning
100%
External limitation
100%
The maximum possible
power is fed in.
Normal feed-in operation.
No limitation.
60%
External limitation
60%
60% of the maximum power
is fed in.
30%
External limitation
30%
30% of the maximum power
is fed in.
0%
External limitation
0%
External limitation 0% No
feed-in.
Disconnection from the
grid.
- The inverter feeds in with limited power as long
as it receives a corresponding signal from the data
logger.
- If no signal is transmitted to the inverter for
more than 5 minutes, it feeds in again with the
maximum possible power.
- The time and amount of the power reduction
is determined by the respective energy supply
company.
- The energy supplier is responsible for the loss of
yield.
-
The external limitation is recorded by the data
logger.
The heat sink can reach temperatures of more than
60° C. The inverter has temperature monitoring
for self-protection (power electronics), which
disconnects the inverter from the grid from 85°C
heat sink temperature.
12.0 further Informations
The following sections provide further information.
12.1 Disposal
Dispose of the packaging in accordance with the generally
applicable legal and technical regulations. Comply with the
environmentally relevant requirements regarding recovery,
reuse and disposal of operating materials and components in
accordance with DIN EN 378.
12.2 Care
Keep the surface of the inverter free of dust and dirt.
12.3 Laws, regulations and technical rules
When constructing solar installations, the laws and regulations
applicable to the respective country at state, federal and
European or international level must be observed.
In general, the generally recognised rules of technology
apply, which are usually formulated in the form of standards,
guidelines, regulations, provisions and technical rules by state
and federal organisations, energy supply companies, as well as
trade associations and committees for the relevant specialist
area.
The installation of solar elements/solar systems must take into
account the requirements of the roof covering, roof sealing
or external wall cladding in accordance with the rules and
regulations of the German roofing trade, or corresponding
national and international guidelines and standards.
A check of the stability, thermal protection and ageing
behaviour is required for subsequent installation.
In order to comply with accident prevention regulations, the use
of safety systems (belts, scaffolding, catching devices, etc.) may
be necessary. These safety systems are not included in the scope
of delivery and must be ordered separately.
Installation may only be carried out by professionally qualified
and authorised personnel with a recognised training certificate
(by a state or federal organisation) for the respective field.
There are no parts inside the inverter that require maintenance
or replacement.
The inverter must not be opened by the customer or the system
installer.
13.0 Technical data
The technical data of the inverters can be found on pages 15-17.
Ordering information for different country versions is shown on
page 18.