Advantech SKY-524 2U Startup Manual Download Page 4

4 SKY-524 Startup Manual 

/SKY-524快速入门手册/SKY-524快速入門手冊

2.  Remove CPU air duct for each Node. 

移除各节奌模块CPU导风罩。

 

移除個節點模組CPU導風罩。

3.  Remove the CPU dust cover from the CPU socket. 

从CPU脚座上移除防尘盖。

 

從CPU腳座上移除防塵蓋。

4.  Assemble the CPU with the CPU clip and align the 

triangle mark on both CPU and the clip, make sure both 

notches A and B on the CPU are carefully aligned with 

the CPU clip. 

对准CPU和夹片角落的三角形标志,正确地将CPU两端的
缺口与夹片组合成CPU与夹片的组合。

 

對準CPU和夾片角落的三角形標誌,正確地將CPU兩端的
缺口與夾片組合成CPU與夾片的組合。

5.  Assemble the heatsink and the sub assembly as above. 

将散热片与上一步骤的组件组合。

 

將散熱片與上一步驟的組件組合。

6.  Carefully align the triangle mark on the CPU against the 

triangle mark on the CPU socket then place the CPU 

with Heatsink into the CPU socket. Note! CPU1 must 

use Cut-Fin Heatsink; CPU0 must use Full-Fin Heatsink 

as diagram below shows.  

对准CPU与CPU脚座上的三角标志,慢慢地放下CPU与散热
片的组件。注意! CPU1请使用Cut-Fin散热片;CPU0使用
Full-Fin散热片。

 

對準CPU與CPU腳座上的三角標誌,慢慢地放下CPU與散熱
片的組件。注意! CPU1請使用Cut-Fin散熱片;CPU0使用
Full-Fin散熱片。

7.  Use a T30 Torx screwdriver for tightening the screws in 

the order of 1,2 -> 3,4 with a torque of 12lbf. 

依照1,2 -> 3,4的顺序,用T30梅花螺丝板手搭配12磅的
扭力,旋紧散热片上的螺丝。

 

依照1,2 -> 3,4的順序,用T30梅花螺絲板手搭配12磅的
扭力,旋緊散熱片上的螺絲。

8.  When removing the CPU and heatsink, use a T30 Torx 

screwdriver to loosen the screws in the order of 3,4 -> 

1,2, then lift the CPU and the heatsink up. 

当您要移除CPU与散热片时,依照4,3 -> 2,1的顺序,用
T30梅花螺丝板手放松螺丝,并提起CPU与散热片。

 

當您要移除CPU與散熱片時,依照4,3 -> 2,1的順序,用
T30梅花螺絲板手放鬆螺絲,並提起CPU與散熱片。

  

System Setup

/系统安装/系統安裝

Summary of Contents for SKY-524 2U

Page 1: ...h Density Server SKY 524 2U 4 SKY 524 2U 4 Startup Manual 1 1 SKY 524 2 1 3 8 2 4 24 2 5 5 1 6 Applicant Advantech Co Ltd Address 26 20 1 No 1 Alley 20 Lane 26 Rueiguang Road Neihu District Taipei 114...

Page 2: ...MBase T IPMI LAN 2 x 10GBase T 1 x 100MBase T IPMI LAN Controller LAN1 Realtek RTL8201EL LAN2 3 Intel X557 AT2 Display Controller AST 2500 VRAM 64 MB video memory 64 MB 64 MB I O Interface I O I O Rea...

Page 3: ...ole system shut downs as a protection mechanism Rear view 8 xNVMe SAS SSD Drives 6 Drives for Node 1 6 Drives for Node 2 6 Drives for Node 3 6 Drives for Node 4 1 1 2200W Redundant PSU Node 1 Node 2 N...

Page 4: ...gle mark on the CPU against the triangle mark on the CPU socket then place the CPU with Heatsink into the CPU socket Note CPU1 must use Cut Fin Heatsink CPU0 must use Full Fin Heatsink as diagram belo...

Page 5: ...ews to undo for the riser card bracket and installing riser cards Riser Card Bracket Riser Card Bracket Installing the Server in a Rack Follow these instructions to mount the SKY 524 into the rackmoun...

Page 6: ...elease the locking latch upward and push the middle member forward to the rear of the slide Install the chassis As shown insert the inner member to the cabinet member Make sure the ball retainer is in...

Page 7: ...re The equipment does not work well or you cannot get it to work according to the user s manual The equipment has been dropped and damaged The equipment has obvious signs of breakage 16 CAUTION The co...

Page 8: ...move a equipment 33 Use only the power cords and power supply units provided with your equipment The equipment might have one or more power cords For North America a UL listed and CSA labeled power c...

Page 9: ...4 SKY 524 9 18 19 20 21 1 22 VESA VESA 23 24 25 26 27 28 29 30 31 32 UL CSA 33 34 35 36 1 30 2 2 2 1 37 38 1 2 3 4 5 6 7 0 C 32 F 35 C 95 F 8 9 10 11 12 13 14 15 16 IEC 60825 1 EN60825 1 1 2 3 17 FCC...

Page 10: ...e making any configuration changes The sudden rush of power as you connect a jumper or install a card may damage sensitive electronic components 3 Electronic components are also vulnerable to damage b...

Page 11: ...rominated diphenyl ethers PBDE HDD 1 0 1 wt 0 01 wt Note 1 Exceeding 0 1 wt and exceeding 0 01 wt indicate that the percentage content of the restricted substance exceeds the reference percentage valu...

Reviews: