Initial Inspection
Before you begin installing your card, please make sure that the
following materials have been shipped:
• 1 PCA-6276 Socket 370 Intel
®
Celeron™ processor-based single
board computer
• 2 Intel
®
Celeron™ processors, and 2 cooling fans (optional)
• 1 PCA-6276 User's Manual
• Utility disks/CD with VGA BIOS
• Ethernet driver disks/CD (PCA-6276VE only)
• Bus Master utility driver/CD
• Disks/CD for OBS Win95/98/NT drivers
• 1 FDD cable
• 2 EIDE HDD cables
• 1 printer (parallel port) cable and 1 serial port cable
• 1 ivory cable for PS/2 keyboard and PS/2 mouse
• 1 USB cable (optional, part no. 1700100170)
• 1 ATX-to-PS/2 power cable
If any of these items are missing or damaged, contact your distributor
or sales representative immediately.
We have carefully inspected the PCA-6276 mechanically and
electrically before shipment. It should be free of marks and scratches
and in perfect working order upon receipt.
As you unpack the PCA-6276, check it for signs of shipping damage.
(For example, damaged box, scratches, dents, etc.) If it is damaged or
it fails to meet the specifications, notify our service department or
your local sales representative immediately. Also notify the carrier.
Retain the shipping carton and packing material for inspection by the
carrier. After inspection, we will make arrangements to repair or
replace the unit.
Summary of Contents for PCA-6276
Page 41: ...30 PCA 6276 User s Manual ...
Page 71: ...60 PCA 6276 User s Manual ...
Page 77: ...66 PCA 6276 User s Manual 5 Using the Start button select Programs Then click on HWDoctor ...
Page 85: ...74 PCA 6276 User s Manual 7 Using the Start button select Programs Then click on HWDoctor ...
Page 93: ...82 PCA 6276 User s Manual ...
Page 107: ...96 PCA 6276 User s Manual ...