OACS Central Chillers : with MG Series Control Instrument
Page: 11
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: [email protected]
E.
Vent all refrigerant relief valves in accordance to ANSI/ASHRAE Standard 15.
1.6 WATER TREATMENT
A.
The use of untreated or improperly treated water in a portable chiller may result in
scaling, erosion, corrosion, algae or slime.
B.
It is recommended that the services of a qualified water treatment specialist be engaged
to determine what water treatment is required.
C.
Advantage assumes no responsibility for equipment failures which result from untreated
or improperly treated water.
D.
Do not use deionized water in this unit. Some customized units may be compatible with
deionized water. Consult the factory before using deionized water.
E.
If the chiller is installed in an environment where ambient temperatures could be under
35°F and/or if the unit operating set point will be 48°F or lower, a glycol and water
solution must be used instead of water. See section 8.1 for glycol ratio recommendations
and proper unit setting.
1.7
MODEL DESIGNATION
A.
The Serial Number identifies the exact configuration of your unit and should be available
when contacting the Factory for service or information.
B.
There maybe additional numbers and letters at the end of the model number to indicate
additional configuration options on the machine.
WARNING: Improper water treatment will void unit warranty.
Typical placement of the Data tag.
Note: Data tag may be placed
elsewhere on certain models.
OACS Series
Chiller Model
Nominal Capacity
OACS - 10S - MG - 1P
Zones
S: Single Zone
D: Dual Zone
Instrument
MG : MG Control Instrument
M1: M1 Series Controller
MZC: Multizone Controller
PLC: Programmable Logic Controller
# of Pumps
1P: Single Process Pump
2P: Process & Evaporator Pumps
3P: Process, Evaporator & Standby Pumps
OASC Series
Central Chillers
Summary of Contents for OACS Series
Page 2: ......
Page 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Page 44: ...Page 44 THIS PAGE INTENTIONALLY BLANK ...
Page 72: ...Page 72 THIS PAGE INTENTIONALLY BLANK ...
Page 85: ...END 2019 ADVANTAGE ENGINEERING INC RE 20190822 ...
Page 86: ......