Clock Installation Instructions
(IPCSS-RWB/IPCSL-RWB/IPSIGNL-RWB)
Version 1.5
4/20/2015
For additional support, visit
www.anetdsupport.com
Installation Instructions
The following instructions should be followed for stainless steel clock
installations.
1.
A ferrite is included if there is concern over line performance. Wrap Cat 5 cable around
ferrite once and clamp shut.
2.
Remove Phillips head screws from both sides of the device. (4 total)
3.
Separate stainless steel baffle from wall mount bracket.
4.
Mount bracket to wall using appropriate mounting hardware; see included template for
detailed instructions or use wall bracket as a guide. Use a minimum of 4 mounting holes.
5.
Connect a network cable (Cat 5 or better) to the internal circuit board and connect any
additional wiring to the stainless steel unit as needed.
6.
Re-insert stainless steel baffle into wall mount bracket.
7.
Replace 4 screws into sides of the device.
8.
Connect the other end of the network cable to a PoE (Power over Ethernet) network switch,
or a PoE injector, on a network with a DHCP server. Some equipment options are listed on
the support site:
www.anetdsupport.com/peripherals
.
9.
If properly installed, the unit should boot and show the time within 30 seconds. See
Boot
Sequence
on other page for details.
10.
Consult the
Clockwise User manual
(see
www.anetdsupport.com/documents
) or 3
rd
party
software guide for further instructions on sending audio and text to the device.
Typical model shown