2
- Position the upper and lower joints on the four pillars already assembled using three TTQ M 8
screws as shown in Figures 2.1 and 2.2
11
ASSEMBLY
Carefully clean the fl oor in the work area before starting the tank assembly phases.
Consider that once the tank is fully assembled, it will be diffi cult to move it, so it is advisable to
carry out the mounting steps near the site where it will be installed.
Make sure that the ceiling of the room in which the tank is assembled and installed has a height
that allows easy loading of the fuel from the upper inlet, it is advisable at least a minimum height
of 280 cm.
1
- Proceed with the construction of the steel frame by assembling the two parts that make
up each pillar with four TTQ M 8 screws, using the appropriate jaws as junctions as shown in
fi gure 1
Lower joint
Figure 2.1
Figure 1
Figure 2.2