
ATS250 - Operator Manual
ATS 250
© 2019. Advance Welding
2
• Prepare the pipe and fitting according to the manufacturer’s specification.
• Unwind all cables from the welding unit.
• Connect the supply cable to the correct voltage and switch it on.
• The unit will power up and show “Connect Fitting”.
• Connect the welding cable to the fitting.
• Read the bar code on the fitting or enter a time.
• Press the Start button.
• The time will count down to zero as the fitting is being welded. Any faults will be
indicated on the display.
• At the end of the weld, disconnect the welding cable to reset the unit.
Quick Start Guide