Total Access 372 Small Business Unit ONT Installation and Maintenance Guide
32
61287722G1-5B
Commissioning and Testing
This
section
provides
detailed
information
on
the
following:
•
• Depending
on
the
local
service
provider’s
requirements
the
technician
may
be
required
to
perform
additional
tests
beyond
the
SBU
ONT
on
the
Customer
Provided
Equipment
(CPE)
wiring
and/or
equipment.
If
this
is
the
case,
a
power
meter
may
be
used
to
test
the
upstream
and
downstream
signal
types
for
voice,
data,
and
video
•
•
•
Turn-Up
Initial
turn
‐
up
of
the
SBU
ONT
involves
applying
power
and
observing
LEDs
for
status
infor
‐
mation.
To
complete
the
turn
‐
up
of
the
SBU
ONT,
complete
the
following
steps:
1. Plug
the
green
UPS
connector
into
the
male
connector
of
the
UPS.
2. Check
to
ensure
the
AC,
output,
and
battery
LEDs
are
green
and
functioning.
The
UPS
is
now
ready
for
normal
operation.
3. View
the
LEDs
on
the
SBU
ONT
as
they
cycle
through
start
‐
up
diagnostics.
A
properly
installed
SBU
ONT
cycles
through
a
sequence
of
operations
during
startup
and
power
‐
up
phases.
shows
the
normal
LED
status
once
the
startup
and
power
‐
up
sequences
are
complete
(approximately
30
seconds).
In
addition
to
the
front
panel
LEDs,
the
SBU
ONT
has
LEDs
that
are
integral
to
the
Ethernet
RJ
‐
45
jacks.
Summary of Contents for 1287722G1
Page 6: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide vi 61287722G1 5B ...
Page 10: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide x 61287722G1 5B ...
Page 12: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide xi 61287722G1 5B ...