Total Access 372 Small Business Unit ONT Installation and Maintenance Guide
14
61287722G1-5B
Instructions for Installing the SBU ONT
A
typical
exterior
SBU
ONT
installation
with
UPS
is
shown
in
Figure 4. Typical SBU ONT Installation
Installations
may
vary
from
this
diagram
depending
on
the
manner
in
which
the
Customer
Provided
Equipment
(CPE)
wiring
is
installed,
the
location
of
the
AC
outlet
used
to
power
the
SBU
ONT
local
power
supply,
whether
or
not
a
communications
distribution
panel
was
provided,
and
the
proximity
of
the
external
ends
of
the
CPE
wiring
to
the
subscriber
electrical
service
point.
UPS with battery backup
installed by technician
GFI/non-GFI outlet - highly
recommend non-GFI outlet
Minimum 12 AWG ground
wire installed from the ONT
to the established MGN
Riser conduit for
fiber drop cable
Power and Alarm leads
require a jacketed, 4 pair
wire of the proper gauge.
Wire run via Customer
provided PVC conduit or
per local practice.
ONT
Customer provided premises
wiring including CAT5 or higher
Ethernet cable and POTS
twisted pairs to be Terminated
in the ONT by technician
Communications
Distribution
Panel
PVC conduit supplied by subscriber
with pull string for UPS low voltage
wiring installed by technician.
Summary of Contents for 1287722G1
Page 6: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide vi 61287722G1 5B ...
Page 10: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide x 61287722G1 5B ...
Page 12: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide xi 61287722G1 5B ...