Chapter 2. Installation
2-2
NT1 T400 User Manual
61212016L1-20
Table 2-1. NT1 Type 400 Switch Settings
Refer to Appendix B, S/T Bus Configurations on page B-1 to determine
what type of bus and termination apply to your installation to set the
switches accordingly.
POWERING UP THE NT1 TYPE 400 STANDALONE
To power-up the NT1 Type 400 Standalone for the first time, perform
the following procedures in order:
1.
Plug the power cord into a grounded, 120 VAC, 60 Hz receptacle.
2.
Verify that the ERROR indicators are illuminated. After about 15
seconds, the READY indicators should flash at a 1 Hz rate.
3.
Should any of these indicators fail to operate as stated, see Chap-
ter 3, Troubleshooting on page 3-1.
Table 2-2 on page 2-3 gives pin assignments for the unit.
Switch
Description
On
Off
6
50
Ω
termination
50
Ω
None
5
50
Ω
termination
50
Ω
None
4
100
Ω
termination
100
Ω
None
3
100
Ω
termination
100
Ω
None
2
Long or short passive bus
Long
Short
1
Future use
N/A
N/A
Summary of Contents for 1212010
Page 1: ...NT1 Type 400 Standalone Part Number 1212016L1 20 Document Number 61212016L1 20A September 1999...
Page 8: ...viii...
Page 10: ...x NT1 T400 User Manual 61212016L1 20 Table of Contents...
Page 12: ...xii NT1 T400 User Manual 61212016L1 20 List of Figures...
Page 14: ...xiv NT1 T400 User Manual 61212016L1 20 List of Tables...
Page 18: ...Chapter 1 About the NT1 Type 400 1 4 Nt1 T400 User Manual 61212016L1 20...
Page 22: ...Chapter 2 Installation 2 4 NT1 T400 User Manual 61212016L1 20...