Site Preparation and Installation Supplement
Positioning the System on your Production Floor
Advanced Dicing Technologies Ltd
.
22
Table 23. Locating Taped System Parts
Number
Location
Removed
1
Air gun
2
Visual system shutter
3
Power cable
4
Emergency Stop Key Pouch (in the Front Panel)
5
Folding Computer Keyboard
6
Clipboard
7
Spindle and Workpiece doors
8
Theta table instructions
9
All air and water inlets and outlets
9.
Make sure you have removed all of the securing jigs, as described in
"Releasing All Moveable Parts and Unsealing the System" on page 16.
Table 24. Removing Jigs
Jig Name
Location
Remove
d
X Jig
Y Jig
See "Y and Z Jigs" on page 16
Z Jig
See "Y and Z Jigs" on page 16
Y Jig
10.
Make sure that all utilities are ready and available.
11.
Contact your local ADT Customer Support representative to complete
the system setup.