background image

 

 

Quick guide - EN

 

 

Seite 

18

 von 

32

 

GSS0608

 

Version: 1.0 

2  Quick guide - EN 

2.1 Product description and download link 

2.1.1 Short description 

The battery storage system is a compact lithium-ion battery storage system for outdoor installation 

directly at the installation site. The system stores electrical power from the AC power supply network 

and feeds it back to the AC power supply network if necessary. 

 

Complete system with integrated inverter 

 

Especially powerful and efficient 

 

Scalable in capacity and power 

 

Suitable for many areas of application such as optimisation of personal consumption and peak-load 

capping. 

The storage system comprises an outdoor double cabinet housing, which is equipped with a battery 

rack, two inverters, an air-conditioning system and an integrated roof fan.  

 

 

F

IGURE 

2:

 

GSS0608

 

 

 

 

 

 

 

 

 
 
 
 
 
 

 

Inverter and connection side  

 

Battery side 

 

 

 

 

 

 

 

Summary of Contents for DVK-GSS0608 001-AA

Page 1: ...StoraXe PowerBooster Kompaktes Speichersystem Compact storage system GSS0608...

Page 2: ...Energy GmbH Kopien und Vervielf ltigungen sind nur mit Genehmigung des Urhebers erlaubt nderungen und Irrt mer vorbehalten Copying and duplication only with the permission of the originator Changes an...

Page 3: ...rung EU declaration of conformity 2 Merkblatt Verhalten im Brandfall Instruction sheet conduct in case of fire 3 Kurzanleitung GSS0608 inkl Downloadlink und Transport Aufbauvoraussetzungen Quick guide...

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ...Anlage Betreiber der Anlage Modell Lithium Ionen und Batteriekapazit t kWh Verhalten im Brandfall 1 Brand melden 2 In Sicherheit bringen 3 Keine L schversuche starten Betriebliche An sprechpartner in...

Page 8: ...g mit Lithium Ionen Batterien Bitte dieses Merkblatt ausgef llt und gut sichtbar in der N he der Anlage aush ngen Bitte dieses Merkblatt dem lokalen Brandschutzverantwortlichen oder der Leitstelle f r...

Page 9: ...perating company of the system Model lithium ion and battery capacity kWh Conduct in case of fire 1 Report fire 2 Get to safety 3 Make no attempts to extinguish the fire Operational contact person Fir...

Page 10: ...um ion batteries Place the filled form clearly visible near the system Please provide this information sheet or an information sheet according to local regulations to the local fire protection officer...

Page 11: ...sverzeichnis Table of contents Version 1 0 GSS0608 Seite 1 von 32 Kurzanleitung Quick guide StoraXe PowerBooster Kompaktes Speichersystem Compact storage system GSS0608 Version 1 0 Kurzanleitung Quick...

Page 12: ...8 Checkliste zur Inbetriebnahme 14 1 9 Kontakt 16 1 9 1 ADS TEC Support 16 1 9 2 Firmenadresse 16 1 10 Anhang Auszug aus E Plan 17 2 Quick guide EN 18 2 1 Product description and download link 18 2 1...

Page 13: ...t diese im Bedarfsfall wieder ins AC Stromnetz ein Komplettsystem mit integriertem Wechselrichter Besonders leistungsstark und effizient Skalierbar in Kapazit t und Leistung F r viele Anwendungsbereic...

Page 14: ...iebsanleitung Elektroplan Sicherheitsdatenblatt der Lithium Ionen Zelle Transport und Vorabinfos GSS0608 Herstellerbetriebsanleitung Wechselrichter ADS TEC EMS Schnittstellenbeschreibung StoraXe HMI A...

Page 15: ...ittel die f r das Gewicht von Speichersystem und Batteriemodulen ausgelegt sind Transportieren Sie die Batteriemodule getrennt vom Speichersystem zum endg ltigen Standort Transportieren Sie das Speich...

Page 16: ...Befestigungsschrauben des vorderen Sockels Unscrew the fastening screws of the front panel Schieben Sie die Frontblende nach vorne und entfernen Sie diese Slide the front panel forward and remove it S...

Page 17: ...rzanleitung DE Version 1 0 GSS0608 Seite 7 von 32 L sen Sie die 4 Befestigungsschrauben und entfernen Sie die Palette Loosen the 4 fastening screws and remove the pallet Palette entfernen Remove palle...

Page 18: ...bieten mit Sandst rmen nicht in st ndigen Wohnbereichen nicht im Bereich von Fluchtwegen aufgebaut und betrieben werden darf Aufstellbedingungen Die Checkliste Voraussetzungen zur Inbetriebnahme muss...

Page 19: ...tabst nde von 1 5 m zu angrenzenden Bauten Ber cksichtigen Sie zus tzliche Abst nde f r ge ffnete T ren und ggf Fluchtwege Beachten Sie bei der Aufstellung in bebauten Gebieten die rtlichen Vorschrift...

Page 20: ...riespeicher Batterietechnologie Lithium Ionen Nomineller Energieinhalt 84 6 kWh Batteriezellen Zellchemie Lithium NMC Allgemeine Daten Aufstellort Outdoor Temperaturbereich 20 C bis 40 C Schutzart IP5...

Page 21: ...V2 2 3 EN 61000 6 2 2005 EN 61000 6 3 2021 Sicherheit EN 62368 1 2014 AC 2015 EN 62311 2008 EN 61439 1 2011 Liste der herangezogenen Vorschriften Normen und Anwendungen EMV ETSI EN 301 489 52 V1 1 0 S...

Page 22: ...imatisierten Innenraum Vermeiden Sie direkte Sonnenbestrahlung gro e Temperaturschwankungen und Frost VORSICHT Sachbesch digung durch falsche Lagerung Lagern Sie die Batteriemodule bis zur Montage in...

Page 23: ...Kurzanleitung DE Version 1 0 GSS0608 Seite 13 von 32 1 7 Sockelzeichnung...

Page 24: ...Kurzanleitung DE Seite 14 von 32 GSS0608 Version 1 0 1 8 Checkliste zur Inbetriebnahme...

Page 25: ...Kurzanleitung DE Version 1 0 GSS0608 Seite 15 von 32...

Page 26: ...Verf gung Tel 49 7022 2522 203 E Mail support est ads tec energy com Alternativ k nnen Sie auf unserer Webseite www ads tec energy com ein Supportformular zur Kontaktierung verwenden Unser Support wi...

Page 27: ...Kurzanleitung DE Version 1 0 GSS0608 Seite 17 von 32 1 10 Anhang Auszug aus E Plan...

Page 28: ...supply network and feeds it back to the AC power supply network if necessary Complete system with integrated inverter Especially powerful and efficient Scalable in capacity and power Suitable for many...

Page 29: ...SS0608 manual with instruction manual electrical diagram safety data sheet for lithium ion cells Transport and preliminary information GSS0608 Manufacturer s operating instructions for the inverter AD...

Page 30: ...of transport that are designed for the weight of the storage system and battery modules Transport the battery modules to the final location separately from the storage system Transport the storage sy...

Page 31: ...en Sie die Befestigungsschrauben des vorderen Sockels Unscrew the fastening screws of the front panel Schieben Sie die Frontblende nach vorne und entfernen Sie diese Slide the front panel forward and...

Page 32: ...uick guide EN Seite 22 von 32 GSS0608 Version 1 0 L sen Sie die 4 Befestigungsschrauben und entfernen Sie die Palette Loosen the 4 fastening screws and remove the pallet Palette entfernen Remove palle...

Page 33: ...ustible materials and in areas with sandstorms in permanent residential areas in the vicinity of escape routes Installation conditions The Commissioning requirements checklist must be completed and si...

Page 34: ...ape routes When installing in built up areas observe the local noise abatement regulations Germany Technische Anleitung zum Schutz gegen L rm Technical Instructions for Protection against Noise abbrev...

Page 35: ...ery storage system Battery technology Lithium ion Nominal energy content 84 6 kWh Battery cells Cell chemistry Lithium NMC General data Installation location Outdoor Temperature range 20 C to 40 C Pro...

Page 36: ...489 1 V2 2 3 EN 61000 6 2 2005 EN 61000 6 3 2021 Safety EN 62368 1 2014 AC 2015 EN 62311 2008 EN 61439 1 2011 List of the applied regulations standards and applications EMC ETSI EN 301 489 52 V1 1 0...

Page 37: ...oned indoor space until installed Avoid direct sunlight large temperature fluctuations and frost CAUTION Damage to property due to incorrect storage Store the battery modules properly in the original...

Page 38: ...Quick guide EN Seite 28 von 32 GSS0608 Version 1 0 2 7 Bottom view of units...

Page 39: ...Quick guide EN Version 1 0 GSS0608 Seite 29 von 32 2 8 Checklist for commissioning...

Page 40: ...Quick guide EN Seite 30 von 32 GSS0608 Version 1 0...

Page 41: ...reached via phone or e mail Phone 49 7022 2522 203 Email support est ads tec energy com Alternatively you can contact us by completing a support form on our website www ads tec energy com Our Support...

Page 42: ...Quick guide EN Seite 32 von 32 GSS0608 Version 1 0 2 10 Appendix Extract of the electrical diagram...

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ...ld be retained and available for employees and other users of this product Commercial product name MODEL CM0940R0008A 94Ah capacity Use of the substance preparation Lithium Ion battery Company underta...

Page 48: ...ironment There is no hazard when the measures for handling and storage are followed In case of cell damage possible release of dangerous substances and a flammable gas mixture 2 Hazards Identification...

Page 49: ...lenty of water Consult a physician After contact with eyes Rinse immediately with plenty of water also under the eyelids for at least 15 minutes Seek medical treatment by eye specialist After ingestio...

Page 50: ...urfaces and sources of ignition Storage Requirements for storage rooms and vessels Storage at room temperature approx 20 C at approx 20 50 of the nominal capacity OCV approx 3 5 3 7 V Keep in closed o...

Page 51: ...ue n a Flash point n a Lower explosion limits n a Vapour pressure n a Density n a Water solubility Insoluble Ignition temperature n a 10 Stability and Reactivity USA EU Stability Stable Conditions to...

Page 52: ...system 13 Disposal Considerations USA EU Advice on disposal For recycling consult manufacturer Contaminated packaging Disposal in accordance with local regulations 14 Transport Information USA EU US...

Page 53: ...ns Cargo 965 IATA max quantity Cargo 35 kg G Description of the goods Lithium ion batteries Other applicable information Lithium equivalent 48 2 g Wh rating per cell 345 Wh 15 Regulatory Information U...

Page 54: ...itization by skin contact R48 23 Toxic danger of serious damage to health by prolonged exposure through inhalation R49 May cause cancer by inhalation R50 Very toxic to aquatic organisms R53 May cause...

Page 55: ......

Page 56: ...ads tec Energy GmbH Heinrich Hertz Str 1 72622 N rtingen Germany Phone 49 7022 2522 201 Email energy ads tec energy com Home www ads tec energy com...

Reviews: