
7
ADRIAN STEEL COMPANY
WWW.ADRIANSTEEL.COM
906 JAMES STREET
ADRIAN, MI 49221
800-677-2726
Publication Number:
54631
Revision
Level:
E
ECN Release:
21473
61-GL2 SERIES / 63-GL2 SERIES,GRIP LOCK Instructions
STEP #2B : FOR A FORD TRANSIT SHIP THRU ONLY—THIS IS THE COMPLET-
ED ASSEMBLY OF A DOUBLE GRIP LOCK.
PLACE ASSEMBLED CROSS BOWS FROM STEP #1 & 3 BACK IN HDW BOX
CONTINUE TO STEP 5 FOR A COMPLETE ASSEMBLY / INSTALL
STEP #3A : GM SHIP THRU ONLY—SINGLE GRIP LOCK
THIS IS THE COMPLETED ASSEMBLY
INSTALLED ROOF RAILS
FROM ROOF RAIL KIT
HDW KIT—CROSS BOW KIT
STOW IN THE VEHICLE FOR
FINAL INSTALLATION
INSTALLED CROSS BOWS-
FROM ROOF RAIL KIT
54627—GRIP LOCK, FSV, CURB.
STOW IN THE VEHICLE FOR
FINAL INSTALLATION
ADD CROSSBAR SUPPORT—
SEE STEP 3B