
Getting Started
27
MVP-5000
2
Getting Started
2.1
Unpacking Checklist
Before unpacking, check the shipping carton for any damage. If
the shipping carton and/or contents are damaged, inform your
dealer immediately. Retain the shipping carton and packing
materials for inspection. Obtain authorization from your dealer
before returning any product to ADLINK. Ensure that the fol-
lowing items are included in the package.
MVP-5000 controller
Accessory pack
Screw pack for wall-mounting and HDD installation
Quick Start Guide
2.2
Installing Hard Disk Drives
1. Remove the 11 bottom cover screws by screwdriver
..
Summary of Contents for MVP-5000 Series
Page 10: ...x Table of Contents This page intentionally left blank...
Page 12: ...xii List of Tables This page intentionally left blank...
Page 14: ...xiv List of Figures This page intentionally left blank...
Page 20: ...6 Introduction Figure 1 3 Left Side View 210...
Page 21: ...Introduction 7 MVP 5000 Figure 1 4 Top View Figure 1 5 Rear View...
Page 22: ...8 Introduction Figure 1 6 Underside View 196 85 85 170...
Page 40: ...26 Introduction This page intentionally left blank...
Page 42: ...28 Getting Started...
Page 46: ...32 Getting Started 3 Gently insert the CFast card until it is firmly seated in the socket...
Page 52: ...38 Power Consumption This page intentionally left blank...
Page 56: ...42 BIOS Setup B 2 1CPU Configuration...
Page 76: ...62 BIOS Setup This page intentionally left blank...
Page 82: ...68 Digital Input Output Function Library This page intentionally left blank...
Page 86: ...72 Important Safety Instructions This page intentionally left blank...