System Requirements
5
CM5-P1000
3
System Requirements
3.1
Power Sequencing
For initial power on, or to Resume from S3 and S4, this sequence
must be followed.
Figure 3-1: Power Sequencing
3.2
Module Power Up and Down
Issuing the PWR_EN signal powers the CM5-P1000 module
down, and the system designer can decide whether to keep the
module input power when the CM5-P1000 module is powered
down.
T
PV-PE
PV
T
PE-PG
PV
T
PV-PE
T
PE-PG