Important
Information
Breaks during work
IMMEDIATELY STOP
Pressing the ‘0’ button will stop the pump.
SHORT BREAKS (up to four hours):
1.
Switch off the paint pump.
2.
Insert the paint roll into a plastic bag
immediately and tie it up to be airtight.
3.
Leave the suction and air bleed hoses in the paint.
LONG BREAKS (days):
1.
Place the paint roll in a bucket of water.
2.
Wet the paint surface in the paint container with
some water to prevent a skin from forming.
3.
Other parts should be cleaned according to the
cleaning instructions.
Summary of Contents for 716-30
Page 4: ...Parts A Roller hood B Hose C Roller brush D Extension pole E Handle F Hose extension ...
Page 6: ...Step2 Insert the roller brush C onto the smaller threads of the hose B2 B2 C ...
Page 10: ...Step6 Slip the hose extension F through the handle thread E2 ...
Page 16: ...www adirpro com customersupport adirpro com Irvington NJ 07111 ...