background image

Turn on the central heating system 

and re-set controls to the customer 

requirements. Open any bypass valves 

previously closed.  Commission the 

system following the manufacturer’s 

instructions. Before leaving the 

property, carry out the final job – 

service 

MagnaClean

 filter ensuring a 

final check is carried out for leaks.

Check that all radiators and bypasses 

are turned OFF, leaving the furthest 

radiator from the boiler open. Turn on 

the filling loop and allow the mains 

water to flush through the system. Allow 

the water to drain out to a convenient 

point outside until clear. When 

complete, fill and vent the radiator and 

allow to circulate. Always open up the 

next radiator before turning off the 

cleansed radiator.  Repeat this process 

on each radiator until system flushing is 

complete.

13

Turn off the filling loop and HTV 

connector isolation valve 1, drain and 

remove 

MagnaCleanse

 assembly. 

All the radiators should now be full. 

Reinstall/Install the 

MagnaClean 

filter 

to system.

N.B Refer to MagnaClean installation 

instructions.

14

Add a suitable inhibitor, such as 

MC1+

®

into the canister. i.e. use the pro-fill 

bleed valve or remove canister lid 

assembly and dose filter. Open up the 

isolation valves and remove any air by 

venting using filter air vent.

15

16

Remember to monitor the MagnaCleanse throughout operation.

Summary of Contents for MagnaCleanse

Page 1: ...Advanced Central Heating System Flushing User Guide for Combination and Sealed Systems ...

Page 2: ...e with care A MagnaCleanse RapidFlush filter MUST be used when carrying out a system flush with a MagnaCleanse Installation of MagnaClean filters and carrying out a system flush with a MagnaCleanse should only be undertaken by competent installers If in any doubt consult a qualified heating engineer Monitor the MagnaCleanse system throughout operation Check jubilee clips are secure before and duri...

Page 3: ...lter To achieve the best protection for the boiler it is important that the flushing process is carried out with the MagnaCleanse hose to valve connector attached to the return pipe of the system For maximum effect it is recommended that cleaner is added for a minimum of 1 hour MC3 Leave for up to 28 days MC5 Leave for up to 7 days The following instructions are designed to assist engineers in the...

Page 4: ...or Attach MagnaCleanse HTV connector to the isolation valve on the pipework using the appropriate adaptor Ensure drain valve is in lower hose N B The flow through MagnaCleanse RapidFlush filter should enter the bottom right and exit top left Turn OFF isolation valves on the RapidFlush filter Loosen and remove the lid assembly from one of the RapidFlush filter canisters Removal of black iron oxide ...

Page 5: ...should be hot at the bottom cold at the top Allow system to reach temperature over 70 C Turn off any bypass valves and all the radiators ensuring they are FULLY closed Leave the furthest radiator open With the system running use ADEY Vibraclean tool attached to an SDS drill set to hammer only mode with no rotary action agitate open radiator for 15 20 seconds along the bottom of the radiator Repeat...

Page 6: ...s are clean Sludge removal tool available at adeyspares co uk Set the boiler control to OFF Attach a drain hose to the MagnaCleanse drain valve and secure with jubilee clip Turn OFF the HTV connector isolation valve 2 on the return pipe to the boiler leaving the HTV isolation valve 1 open 10 11 12 Check jubilee clips are secure before and during operation Step by step Continue the VibraClean radia...

Page 7: ...utside until clear When complete fill and vent the radiator and allow to circulate Always open up the next radiator before turning off the cleansed radiator Repeat this process on each radiator until system flushing is complete 13 Turn off the filling loop and HTV connector isolation valve 1 drain and remove MagnaCleanse assembly All the radiators should now be full Reinstall Install the MagnaClea...

Page 8: ...terial A carbon neutral company For the most up to date version of installation and serving instructions visit www adey com All ADEY marks are trademarks of Adey Holdings 2008 Limited Please visit adey com trademarks for a list of ADEY marks Copyright Adey Holdings 2008 Limited 2019 All rights reserved ...

Reviews: