Adey MagnaClean Professional Installation And Servicing Instructions Download Page 2

N.B. We firmly recommend MagnaClean Professional is

installed and serviced by a qualified heating engineer.

Chemical dosing

Open the isolation valves to the marked ON

position and vent/bleed through the Pro-Fill air

vent. Protect the surface below the canister with a

dust sheet or container to capture any drops of

water. Run the central heating system while

checking for leaks. Repeat steps 1 - 6 if required.

Ensure the filter is thoroughly clean before 

leaving the premises.

Replace the lid assembly onto the canister and

tighten until sealed. Do not over tighten.

Wrap paper towelling around the build-up of

sludge on the plastic sheath. Place lid assembly over

a bucket and remove the plastic sheath from the

magnet, remove the sludge then rinse clean.

Replace the sheath over the magnet.

Remove the complete lid assembly from the

MagnaClean Professional

Turn the lid assembly upside down in order that the

underside of the lid acts as a drip tray.

Using the MagnaClean Professional lid spanner,

carefully unscrew the lid.

Important

– Before commencing any servicing work,

turn off electrical supply to the boiler. Ensure the

water is not too hot to undertake work on the

system. Turn off both isolation valves to the marked

OFF position. Loosen the air vent to release internal

pressure. When venting, protect the surface below

the canister with a dust sheet or container to

capture any drops of water.

Servicing

In both diagrams, position 

A

is best practice 

while 

B

is suitable.

Prepare the pipe and fittings accordingly. 

Lubricate the olives and assemble the valves 

on the pipe. Hand tighten.

Installation

1

3

Loosely secure the MagnaClean Professional

canister to the valves. Grip the MagnaClean canister

and tighten the compression fittings being careful

not to over tighten.

Loosen off the valve flange nuts and insert the

rubber washers provided. Thoroughly tighten the

flange nuts. Do not over tighten. 

Refill the heating system.

Run the central heating system while checking

for leaks. Attach the self-adhesive MagnaClean

Professional label to the boiler, indicating your

name, telephone number, date of installation and

serial number. Always service the filter before

leaving the premises. The lid and valve spanner

can be left with the customer.

4

5

1

2

3

1

2

3

4

5

6

 

 

Open vented system 

Combi/Sealed system 

 

 

MagnaClean

®

Professional is suitable for all central

heating systems and can be fitted anywhere on the
main circuit. However, in order to achieve the best
protection for the boiler, it is recommended that
MagnaClean Professional is fitted after the last
radiator before the boiler. In determining a suitable
location for installation, it is important to ensure you
allow adequate access for servicing.
The following instructions are designed to assist
engineers in the safe and effective installation and
servicing of ADEY’s MagnaClean Professional and
should be followed at all times. Any queries arising
from either installation or servicing should be directed
to your supervisor or ADEY direct on 

01242 546700

.

Drain the central heating system or plug-off feed

and expansion tank and release the system

pressure. Measure and mark a 110mm section for a

22mm unit and a 195mm section for a 28mm unit

when making the connections with elbows

supplied, as shown in 

3

below. When installing

below a boiler or other object, allow 250mm

clearance from the top of the canister to beneath

the object, to enable the lid assembly to be

removed when servicing. This applies to both 22mm

and 28mm MagnaClean Professional canisters.

Replace the Pro-Fill air vent. Allow the system to

circulate for 30 seconds. Open the Pro-Fill screw

two turns and back flush until clear.

Wait for five seconds before removing the adaptor. 

The Pro-Fill air vent will accept all market-leading

chemicals in either liquid or concentrate form.

With a standard radiator key remove the Pro-Fill air
vent. The built-in, one-way valve will prevent water

from escaping. Attach chemical adapter and 

feed in chemical.

Using a suitable cutter, carefully remove 

the marked section of pipework to create 

the correct opening.

2

6

Protecting the nation’s central

heating systems

Installer:

Telephone:

Installation date:

Serial No.

Reviews: