
ADC Telecommunications, Inc.
13
I
NSTALLATION
AND
T
EST
R
EQUIRED
T
OOLS
AND
T
EST
E
QUIPMENT
The tools and test equipment required for the installation of the Field Shelf are:
• Volt-ohmmeter
• 216 tool (Can Wrench)
• # 2 Phillips-head screw driver
H
ARDWARE
I
NCLUDED
WITH
THE
K
IT
• Two Mounting Brackets
• Four 10-32 x ¾" Pan Head Phillips Screws
• Four #10 Flat Washers
• Four 3/8” Spacers
• Four 10-32 x 3/8" Pan Head Phillips Screws
or
• Two Mounting Brackets
• Four 1/4-20x ¾" Captive Hex Head Screws
• Four 1/4" Cup Washers
• Four 1/2" Spacers
• Four 1/4-20 x 1/2" Hex Washer Head Screws
Refer to
for Field Shelf cable wire gauges and lengths.
Table 3. Cable Wire Gauge and Length
Cable
Wire Gauge (AWG)
Length (FT)
Network (T1/HDSL) Cable
24
30
±
1 FT
DSL Cable
24
30
±
1 FT
Subscriber Cable
24
30
±
1 FT
Alarm Cable
24
30
±
1 FT
Power Cable
16
30
±
1 FT
Frame Ground Cable
6
15
±
1 FT