ADCP-96-015 • Issue 1 • July 2004
Page 16
© 2004, ADC Telecommunications, Inc.
Figure 8. Constructing the Concrete Pad for the ACE-142S/142V Cabinet
6 IN.
(15.2 CM)
4 IN. MIN.
(10.2 CM)
COMPACTED SOIL
SAND OR
GRAVEL
19616-A
TOP OF PMF SHOULD
BE FLUSH WITH TOP
OF CONCRETE
90 BEND
IN DUCT
TOPSOIL OR
DECORATIVE ROCK
GRADE
72.0 IN.
(182.9 CM)
9.0 IN.
(22.9 CM)
28.0 IN.
(71.1 CM)
26.1 IN.
(66.4 CM)
30.6 IN.
(77.7 CM)
44.0 IN.
(111.8 CM)
33.0 IN.
(83.8 CM)
REINFORCED
CONCRETE PAD
4 IN DUCT FOR
DISTRIBUTION CABLES
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
PAD MOUNT FRAME
CAST IN PLACE
4 IN DUCT FOR
FEEDER CABLES
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
DO NOT POUR CONCRETE INSIDE
THE PAD MOUNT FRAME
GROUNDING ROD
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
FRONT