150-454-111-06
Installation
HRE-454
February 25, 2000
11
1
Select a convenient mounting location on the pole or pedestal.
2
Unscrew the four bolts that connect the mounting bracket side plates to the enclosure base. Remove the
mounting bracket from the enclosure.
3
Position the mounting bracket against the pole or pedestal (stub down) and mark the location of the four
mounting holes. Use the four corner mounting holes for this application.
4
Place the mounting bracket out-of-the-way.
5
Drill four holes
1
/
4
-inch (0.635 cm) in diameter by 3 inches (7.62 cm) deep at the locations marked in Step 3.
6
Start an anchor bolt in each of the two top matched bolt mounting slots and tighten the bolts into the wall
approximately two-thirds of an inch of the bolt length.
7
Rest the mounting bracket top outside holes over the two bolts.
8
Insert the lug bolts into the two bottom outside holes of the mounting bracket and start bolts.
9
Secure the enclosure bracket to the pole or pedestal by tightening all lug bolts until snug.
10
Using the four sideplate bolts, reattach the enclosure’s base mounting bracket to the mounting bracket.
Torque the mounting bracket bolts between 30 and 40 inch-pounds.
11
If the cable stub connects to an underground cable, dress the cable stub down the pole or pedestal to the splice
case. If the cable stub connects to an aerial cable, form a drip loop in the stub and dress the stub up the pole
or pedestal to the splice case.
Flat Surface Mounting
Use the procedure below to mount the enclosure on a flat surface in a manhole. You must allow for enough top
clearance to remove the cover (see
). Allow at least 3 inches (7.62 cm) of clearance above the
dome if the 31° tilt feature is used and allow at least 10 inches (25.4 cm) of clearance if the tilt feature is not used.
Have the following equipment ready before you begin:
•
Four
3
/
8
-inch (0.952 cm), 16 NC anchor bolts, 2
1
/
2
inches (6.35 cm) long for wall mounting
•
Four
3
/
8
-inch (0.952 cm) washers
•
One Wrench
•
One Drill with a
1
/
4
-inch (0.635 cm) bit
While mounting the enclosure, hold the enclosure securely to prevent personal injury or
damage to the enclosure.
The desiccant bags shipped with the List 2A, List 2B, List 4, and List 6 units must be activated
prior to closing the lid. Do this by removing the bags from their plastic container and placing
them inside the enclosure.
While mounting the enclosure, hold it securely to prevent personal injury or damage.