background image

5 .����H������ D��� B����RY 
��D��

1. Measuring system: Turbine
2. Inlet/Outlet : 1” BSP/G female
3. Measuring range:  5 - 150 lpm 
4. Accuracy ± 0.5%
5. Repeatability (typical): ± 0.3%
6. Max Pressure of use: 3,5 bar (50 psi)
7. Temperature of use: -10°C + 60°C 
8. Display: 6 digits LCD 
9. Power supply: Alkaline batteries 2x1.5V AAA
10. Impermeability rating: IP65
11.Weight: 0.25Kg 

4.4 D��G������� 

�R�B���

The meter is not 
reading

The display is 
not switching on 

Inaccurate preci-
sion reading

�����B�� ���U��

1. turbine is blocked
2. wrong installation 
3. Reed switches are 
broken
4. turbine has been 
reassembled reverse

1. exhausted batteries 
2. bad contact on 
batteries

1. flow rate too low or 
too high
2.wrong calibration
3.air inside system
4. dirty magnets

���U�����

1. Disassemble & 
clean turbine
2.verify thanks 
to the arrow on 
the meter that it 
i correctly fitted 
on the line.
3. contact your 
supplier to get an 
Exchange board
4. rotate the 
turbine by 180°

1. change 
batteries 
2. verify batteries 
positioning

1. verify technical 
data on pump 
flow rate
2.calibrate
3. verify that 
pump is not 
sucking air
4. clean magnets

4.3 �����K

If the meter has to be positioned in stock for a 
while, clean it carefully. This will help to prevent 
eventual damages. 

11 

ADAM PUMPS

 • DI - FLOW IN LINE

5 .����H������ D��� D�-F��W 
12V �U���R ��D��

1. Measuring system: Turbine
2. Inlet/Outlet : 1” BSP/G female
3. Measuring range:  5 - 150 lpm 
4. Accuracy ± 0.5%
5. Repeatability (typical): ± 0.3%
6. Max Pressure of use: 3,5 bar (50 psi)
7. Temperature of use: -10°C + 60°C
8. Display: 6 digits LCD 
9. Connection cable antiflame: 2m
10.  Power supply: 12vDC - 10mAh (12, 
brown 0v)
11.  Relay contacts: max.voltage 24vdc 500mAh 
(white,grey)
12.  Pulser output: 0-12vDC, 100 imp/unit (green)
13.  Impermeability rating: IP65
14.  Weight: 0.25Kg

Summary of Contents for DI-FLOW IN-LINE AdBlue

Page 1: ...cabinets meter DC and AC pumps accessories repair kit USE AND MAINTENANCE MANUAL DIGITAL FLOW METER IN LINE IN LINE 12V pulses version ...

Page 2: ...en designed and built for INSTALLATION IN NORMAL WORKING CONDITIONS according to CEI standards 17 13 6 1 This use and maintenance manual and related EC certification of compliance should be considered as part of the machine if the machine is sold they must be handed down to new owner 0 EC COMPLIANCE STATEMENT ADAM PUMPS SPA Via della Resistenza 46 48 41011 Campogalliano Modena Italy states taking ...

Page 3: ...t Any type of service maintenance control must be done by qualified personal During maintenance operations and services make sure to have disconnected the power supply Do not exceed the maximum pressure of 3 5 bar 1 4 General SAFETY NORMS Always wear a protection equipment that is suita ble to the operations to carry out according to the liquid that is being used If any doubt review the product sa...

Page 4: ...ween Litre Gallon Pint Quart of Custom configured by the customer For major information about these option refer to the appropriate paragraph 2 3 AUTHORIZED FORBIDDEN USE The flowmeter can be used with different fluids depending of purchased version 1 DI FLOW IN LINE Diesel black meter body Diesel Kerosene for heating Solvents Anti freeze Light oils max cinematic viscosity 300 cSt 2 Di FLOW IN LIN...

Page 5: ... cover total button display reset button battery alter simbol 1 2 3 3 2 1 ELECTRICAL WIRING FOR PULSER VERSION If you bought our pulser model the flowmeter is fitted with a 2m cable with 5 internal wirers to be connected as follows 1 Yellow wire power 12 Vdc 2 Brown wire power 0 Vdc 3 Green wire pulser channel 100 imp unit 4 White and grey wires Relay contact should you desire to control the pump ...

Page 6: ...s at transaction start An active meter will go back to this screens after 10 seconds without activity This screen is used as initial condition to describe other 4 available screens displays 6 digits no decimal shows all litres transferred since first use Cannot be reset 3 4 MAIN FUNCTIONS The meter switches on automatically when a transaction starts or when a button is pressed The display switches...

Page 7: ...wait 10 seconds until the partial screen I displayed displays 5 digits no decimal place settable at maximum 65000 litres Such number identifies the minimum stock in the tank under which the meter will display the alarm To set this alarm level go to Alert screens and press button Value on display will start blinking and will be then modifiable increasing the value pressing button or decreasing it p...

Page 8: ...ering a different fluid after dis assembly at different temperature or after signifi cant wear A proving container or a container of KNOWN volume will be needed for the calibration procedure It is recommended that the container volume be at least 19 liters 5 gallons 18 16 14 12 16 18 5 ATTENTON the system does not allow a cali bration if quantity transferred is under 5 litres Calibration procedure...

Page 9: ...aragraph 3 5 3 Selecting unit of measure 2 Once the choice of custom has been confir med pressing button the meter will propose the default value blinking 0 100 3 Increase or decrease this value with and button until you reach the desired value taking into account that reference unit is the litre 4 Once the correct value is displayed wait 10 seconds the meter will save the value and return to Part...

Page 10: ...in history visualize first transaction in history visualize total of first two transactions in history visualize total of first three transactions in history visualize total of first four transactions in history visualize total of all transactions in history visualize total Total visualize period total totPer reset period total totPer visualize the Stock situation modify the value in Stock visuali...

Page 11: ...display brightness will be low It will be necessary to change batteries 4 2 CLEANING THE TURBINE The meter has 2 magnets fitted into the turbine This magnets could attract metallic powders if present that could block the turbine into the meter body For that reason it could be necessary to pe riodically verify and eventually clean the magnets To do this unscrew the internal shaft and its bolt Take ...

Page 12: ...erify thanks to the arrow on the meter that it i correctly fitted on the line 3 contact your supplier to get an Exchange board 4 rotate the turbine by 180 1 change batteries 2 verify batteries positioning 1 verify technical data on pump flow rate 2 calibrate 3 verify that pump is not sucking air 4 clean magnets 4 3 STOCK If the meter has to be positioned in stock for a while clean it carefully Thi...

Page 13: ...4 3 Meter cover tf035 1 4 Electronic PCB tf046 1 5 Screws m3 vt010 1 6 Battery AAA tf048 2 7 O ring or018 1 8 Body Diflow inline tf036 1 9 Turbine shaft tf039 1 10 Turbine holder tf038 2 11 Turbine tf037 1 12 Magnet tf040 2 13 Self blocking bolt vt009 1 14 Screw m3 x 12 vt011 1 DI FLOW IN LINE ADAM PUMPS 12 ...

Reviews: