CHECKS BEFORE STARTING UP
• Check that the safety valve is correctly installed and that the outlet is connect-
ed to the sewer
.
• Check that the tank is filled with water.
• Check that the air has been correctly bled from the circuit.
• Check that the pipes are correctly connected and there is no leak.
• Check that all electrical connections have been carried out according to the
appliance type (single or three-phase) and in compliance with local regulations.
• Check that all electrical connections are secure.
• Make sure that all access covers are closed.
STARTING UP
1. Switch on the appliance.
2. Turn the control thermostat to define the required temperature (can be adjust-
ed between 20°C and 65°C).
General remarks
• In order to prevent the generation of legionella bacteria, the thermostat
is factory-set to 65°C.
• The safety temperature limit switch integrated into the thermostat helps
avoiding all kinds of incidental overheating.
• During warming up, the expansion of water may cause flow-out from the
safety group.
Glass BL-ST:: 1221114201/03_661Y3300 • A
Starting Up
23
EN