![ACV CC105s Installation & Maintenance Manual Download Page 28](http://html.mh-extra.com/html/acv/cc105s/cc105s_installation-and-maintenance-manual_2845462028.webp)
23
9. External Wiring
T
T
To Challenger
Low Voltage
Terminal Strip
Circulator
Zone 1
Thermostat
zone 1
Honeywell
R845A
Relay
120
H
VAC
N
Circulator
Zone 2
Thermostat
zone 2
Additional zones may be
added as shown above
7
8
6
2
1
4
3
5
6
2
1
4
3
5
T
T
T
T
Fig. 16: Field Wiring with Zone Circulators
Thermostat
Zone 1
Zone 1
Circulator
120 VAC
N
To Challenger
Low Voltage
Terminal Strip
Zone 2
Circulator
Zone 3
Circulator
Thermostat
Zone 2
Thermostat
Zone 3
R C T1 T1
T2
T2
T3 T3
C3
C3
C2
C2
C1
C1
PR
PR
X2
X1
L1
L2 ZC
H
7
8
Fig. 17: Typical Zone Relay Panel Wiring
Summary of Contents for CC105s
Page 62: ...57 19 Notes Section XIX Notes ...
Page 63: ...58 19 Notes ...