![ActivePure A1024F Manual Download Page 6](http://html1.mh-extra.com/html/activepure/a1024f/a1024f_manual_2843895006.webp)
6
RECOMMENDED INSTALLATION TOOLS
INSTALLATION REQUIREMENTS
1 . Unit should be installed after the air handler in the
HVAC system .
2 . The duct work around the installation area should
be clean and dry to ensure proper adhesion of the
gasket materials and any tape used .
3 . When installing near a furnace or heating coils, run
the heating system through three (3) full heating
cycles to ensure the temperature of the INDUCT
unit does not exceed 200
°
F (93
°
C) .
• This unit must be installed by a licensed HVAC contractor or
electrician; failure to do so will void warranty of the product
• When the unit is installed in a roof mounted HVAC system, the unit
must be protected from the elements
CAUTION
If installed near a furnace or where emergency heat coils could raise
the temperature inside the plenum, cycle the AC unit through three
full heating cycles assuring that the temperature never exceeds 200
°
F
(93
°
C). The ActivePure
®
Cell must not exceed 200
°
F (93
°
C).
WARNING
3 1/2” Hole Saw
(for wood or metal)
Drill/Power
Driver
Phillips
Screwdriver
3/8” Drill Bit
(if installing into
fiberglass ducting with
toggle bolts)
YOU MAY ALSO NEED:
1/4” Nut
Driver
Bit
When the unit is installed in a roof mounted HVAC system, the unit
must be protected from elements.
CAUTION
Tin Snips
(for metal ductwork)
Utility Knife
Dust Mask
1/4
Air Handler
ActivePure
®
Induct Guardian II
Min . 10” x 10”
ActivePure
®
Induct Guardian III
Min . 12” x 12”
Installation Clearance
4 . Depending on model, one opening (ActivePure
®
Induct Guardian II) or two openings
(ActivePure
®
Induct Guardian III) approximately 4” (four inches) (10 .16 cm) in diameter will need to
be cut into the existing duct work to install the unit properly .
NOTE:
Unit requires power 24/7 . Do not install where power to the unit will be cycled on and off .