- 22 -
14. CHECKS
-
Adjust the belt and cable control tension after the first few working hours to compensate
initial loosening.
-
Briefly operate all the machine’s components to detect any abnormal noises or
overheating.
-
During the initial running in period avoid heavy-duty usage to encourage proper settling
of the mechanical parts.
-
Never neglect maintenance operations after work and carry out all prescribed checks
regularly.
A) TYRE PRESSURE
Regularly check the tyre pressure. (
1.8 bar - 23 psi ).
If both two tyres are not inflated to average pressure the machine will tend to travel sideways
during operation.
WARNING!
ANY COMPLEX JOB AND ANY WORK AFFECTING THE SAFETY OF
THE OPEATOR AND/OR OTHER PERSONS MAY ONLY BE CARRIED
OUT AT AN AUTHORISED SERVICE CENTRE
Summary of Contents for AC 562
Page 1: ...Safety and operation instruction AC 562...
Page 2: ...2...
Page 11: ...11 Figure 1 Figure 1 bis...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...