1.3 Use Bolts, Washers & Nuts of A2 to secure the rest Upper Leg Tubes (MF-4) to the Lower Leg Tubes with
Welded Socket (MF-6). See Fig 4.
Slide the Leg Foam (T10) into the Leg Tube done in Fig.4 as shown in Fig.5.
Figure 4 Figure 5
1.4 Put the Net (MT-2) into the leg tubes done in the above step 1.3 as shown in Figure 6.
Figure 6
©
ACTION SPORTS EQUIPMENT PTY LTD –
www.actionsports.com.au
Page: 13