
I/O SERVER User’s Manual Industrial PC
___________________________________________________________________
________________________________________________________________________
Acromag, Inc. Tel:248-295-0310 Fax:248-624-9234 Email:solutions@acromag.com http://www.acromag.com
7
To install the IOS modules, first remove all power from the device.
The
IOS Carrier is not hot swappable.
Failure to power down the I/O Server
prior to removing the IOS carrier will result in board damage. To remove
the IOS Carrier turn the two Captive screws counterclockwise on the front
panel until they are free of the enclosure. Then pull the IOS Carrier out
from the enclosure. The IOS Carrier slides out on guide rails. Note that
some force is required to remove the IOS Carrier, especially if IOS
modules are already installed. Refer to the picture below.
Once the IOS Carrier has been removed install the IOS modules onto
the Carrier board. The modules are keyed to avoid incorrect installation.
No further hardware is required to secure the IOS modules. The four slots
are marked as A, B, C or D. Note the slot location of each module as this
information is necessary to access the IOS module from software. Refer to
Section 4.0 for further information on accessing the IOS modules.
IOS Module Installation
DANGER: The IOS Carrier is
NOT hot swappable. Power
must be removed from the
device before removing the
IOS Carrier.
Figure 2.1:
IOS Carrier
Removal.
To remove the Carrier turn the
2 captive screws to the left
until they are detached from
the faceplate. Then pull out
the IOS carrier.
Figure 2.2a:
IOS Module
Installation
To install the IOS Modules
firmly press them into any of
the four available slots. IOS
Modules are keyed to avoid
incorrect installation.
IOS Carrier
Captive Screws (2x)