In addition to the SART and 3.3 feet (1 m) pole, a mounting bracket for
the body and two rubber clips for the pole are supplied. The equipment
does not include mounting hardware for the bracket and the clips, as
these will depend on the bulkhead material and its thickness. Bracket
and clip mounting holes and SART mounting details are shown in Figure
3.
To install SART:
1.
Remove SART from its packaging and check for shipping damage.
2.
Perform the SART test (see Self-test Procedure on page xx).
3.
Remove the two halves of pole and attaching parts from packaging
and assemble to SART as follows:
a.
Screw upper pole to lower pole. Tighten using suitable
wrenches.
b.
Push the upper pole into the pole holder on the SART and
secure using the plain washer and 6 mm lockrut supplied..
4.
Select a position for SART Mounting allowing sufficient space for
the assembled pole.
Note: The SART contains magnetic material. Ensure that the
position that you select is at least 7 feet (2m) away from compass
installations.
5.
Drill holes A and B to dimensions shown on Figure 3. Hole B
should be at least 3 feet above deck.
6.
Place clips in position and secure them to bulkhead.
7.
Mount SART on bulkhead as follows (see figure 3):
a.
Insert SART pole into clips fitted in step 6.
b.
Position bracket above stepped part of SART casing.
c.
Mark position of four bracket fixing holes C.
Summary of Contents for Pathfinder 2
Page 2: ...2 Y1 03 0154 Rev A...
Page 3: ...3 Y1 03 0154 Rev A...
Page 18: ...18 Y1 03 0154 Rev A NOTES...
Page 19: ...19 Y1 03 0154 Rev A NOTES...
Page 20: ...20 Y1 03 0154 Rev A...