Date: 04/12/21
Part #: 5914-000-001
INSTALLATION, OPERATION
& MAINTENANCE MANUAL
Page 8 of 11
WASTE PLUMBING
NEO-METRO FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863
Basin
Grid Strainer w/ 1-1/2
”-16 UNE Threads
Rubber Gasket
1-1/2
” P-Trap
1-1/2
” Tailpiece
Basin Assembly
Install Grid Strainer and 1-1/2” Tailpiece to Deck using Plumber's
Putty.
6
7
Flat Fiber Washer
1-1/2
”-16 UNI Rough Chrome Brass Jam Nut
1-1/2
” Tailpiece
4
6
3
5
2
1
1
3
2
2
1
3
2
1
3
4
6
5
5
Basin Assembly
P-Trap Enclosure Cover
1/4 - 20 UNC x 3/4” Screws (Provided); Hinge Point
2
1
3
Attach P-Trap Enclosure Cover to Basin Assembly using
1/4 - 20 UNC x 3/4" Screws (Provided).
1
2
3
DETAIL C
C
IMPORTANT: To open P-Trap Enclosure and access
components located within, remove upper and front
screws while supporting the front of the cover.
Cover is hinged and will swing down when supported
with the lower mounting screw only.
4
4
1/4 - 20 UNC x 3/4” Screws (Provided)
4
3
5
5
#10-32 Captive Nuts (Provided)
HINT: Teflon tape is recommended on all
threaded waste and supply connections.
Assemble Waste Piping connections and attach 1-1/2” P-Trap to
Waste Piping.