Acorn Safety S0730 Installation, Operation And Maintenance Instructions Download Page 2

 

1. Read the installation instructions prior to beginning the installation.

2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or 

damaged parts from Acorn Safety prior to beginning installation.

3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted 

blockages in the safety equipment.

4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is 

provided for documentation purposes.

5. all employees at risk of contamination should be informed and trained in the use of this and any other safety 

equipment. The signage provided should be posted appropriately in close proximity to this equipment.

Installation & Operation Manual

PRELIMINARY STEPS

 

Manual #7109-104-001

ROUGH IN

2

1

8

"

(54)

13

3
4

"

(348)

Ø2

1

8

"

(54)

7"

(178)

3
4

"

(19)

6

3
8

"

(161)

Ø6

1

8

"

(155)

1

3
4

"

(43)

1/2" NPT

BALL VALVE

STRAINER

1/2" NTP

MALE
CONNECTION

1/2" NTP
FEMALE CONNECTION

SUPPLY LINE

BY OTHERS

Ø11

1
2

"

(292)

HOLE

Ø1

3
8

"

(32)

HOLE 2X

4"

(102)

2"

(51)

8

1
2

"

(216)

MIN.

Revised: 01/04/13

Page 2 of 5

 

Acorn Safety

 

a division of Acorn Engineering 

Company

Reviews: