Acorn Safety S0706 Installation, Operation And Maintenance Instructions Download Page 2

 

1. Read the installation instructions prior to beginning the installation.

2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or 

damaged parts from Acorn Safety prior to beginning installation.

3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted 

blockages in the safety equipment.

4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is 

provided for documentation purposes.

5. all employees at risk of contamination should be informed and trained in the use of this and any other safety 

equipment. The signage provided should be posted appropriately in close proximity to this equipment.

Installation & Operation Manual

PRELIMINARY STEPS

 

Manual #7109-505-001

11

1
2

"

(292)

Ø 2

1

8

"

(54)

3

1
8

"

(78)

2

3
4

"

(70)

1-11

1
2

 NPS

MOUNTING HOLE

SIZE Ø 1-3/8"

3/8-18 NPT
SWIVEL
CONNECTION

S0706

Revised: 03/22/13

 

Acorn Safety

 

a division of Acorn Engineering 

Company

Page 2 of 5

Summary of Contents for S0706

Page 1: ...ment of repair of defective material provided Acorn is notified in writing within one year from date of shipment F O B Industry California This warranty does not cover installation or labor charges and does not apply to materials which have been damaged by other causes such as mishandling or improper care or abnormal use The repair or replacement of the defective materials shall constitute the sol...

Page 2: ...der to comply with ANSI Z358 1 the safety equipment must be inspected periodically An inspection tag is provided for documentation purposes 5 all employees at risk of contamination should be informed and trained in the use of this and any other safety equipment The signage provided should be posted appropriately in close proximity to this equipment Installation Operation Manual PRELIMINARY STEPS M...

Page 3: ... deck escutcheon through hole and secure in place with washer and retaining nut provided from underneath counter top 3 Insert drench hose assembly down into mounted escutcheon STEP TWO SUPPLY LINE 1 Install water line supplied by others in close proximity to drench hose location 2 Connect 3 8 NPT reinforced hose supplied with drench hose to plumbed water supply 3 Open water supply 4 Test for leaks...

Page 4: ... from remaining against the cornea possibly causing unnecessary damage or pain 3 Using thumb and forefingers fully open eyelids and flush eyes thoroughly for approximately 15 minutes or until medical personnel arrive Be prepared to let the doctor know what type of contamination has entered the eye 4 When finished release the handle and return drench hose assembly to standby position Flushing fluid...

Page 5: ... DEG ELBOW CHROMED 4 7105 050 000 DRENCH HOSE VALVE 3 8 FPT X 3 4 14 UNS 5 7105 054 000 DRENCH HOSE HANDLE 3 4 14 UNS X 1 4 18 NPT 6 7105 057 000 8 FLEXIBLE YELLOW PVC HOSE 7105 056 000 8 FLEXIBLE STAINLESS STEEL HOSE 7 7105 068 199 DRENCH HOSE DECK MOUNT ADAPTER 8 7105 075 001 DECK MOUNT DRENCH HOSE ESCUTCHEON ASSY 1 3 2 4 7 8 6 5 Revised 03 22 13 Acorn Safety a division of Acorn Engineering Comp...

Reviews: