background image

 

1. Read the installation instructions prior to beginning the installation.

2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or 

damaged parts from Acorn Safety prior to beginning installation. See page 4.

3. Flush water supply line prior to installation. This will remove unwanted debris from the lines and prevent unwanted 

blockages in the safety equipment.

4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is 

provided for documentation purposes.

5. All employees at risk of eye contamination should be informed and trained in the use of this and any other safety 

equipment. The signage provided should be posted appropriately in close proximity as required by ANSI and 
OSHA.

Installation & Operation Manual

PRELIMINARY STEPS

Manual #7109-400-001

 

ROUGH-IN

5

5
8

"

(143)

2

1
2

"

(64)

4

7
8

"

(124)

2

1
2

"

(63)

SUPPLY

Ø2"

(51)

4X Ø1/4"-20

(6)

TAPPPED

HOLE

Ø

1
2

"

(13)

NPT SUPPLY

3

1

8

"

(79)

MOUNTING DETAIL

100°"

16

1
4

"

(413)

20

1

8

"

(511)

5"

(127)

3

1
2

"

(89)

2"

(51)

SUPPLY

1/2" NPT

SUPPLY

Page 2 of 5

Revised: 01/07/2013

 

Acorn Safety

 

a division of Acorn Engineering Company™

Reviews: