acorn controls TEMPFLOW TZV Installation, Operation And Maintenance Instructions Download Page 5

 

Page 5 of 5

Acorn Controls 

Division of Acorn Engineering Company

®

, A member of Morris Group International

TZV Installation & Operation Manual

1.  Loosen locknut 

6

Detail “B”

4.  Tighten locknut 

6

 to prevent any unauthorized

  or accidental temperature adjustment.

5.  Re-check temperature gauge 

9

.

3.  Using an Allen wrench 

7

 turn adjustment stem 

 

counterclockwise for hotter or clockwise for

  colder outlet temperature. 

Detail “C”

 

2.  Let temperature can stabilize.

ADJUSTMENT:

Detail “A”

Detail “B”

Detail “C”

3.  With ball valves 

2

 and 

3

 closed, slowly open

  ball valve 

4

Detail “A”

5.  Slowly open ball valve 

3

 to allow the system to

  be purged of any remaining air.

2.  Turn on water to specific zone.

6.  Once a constant flow of water is coming out of

  the hose 

1

, close ball valve 

2

 and remove hose

 

1

.

1.  Connect installer provided 1/2” hose 

1

 to ball

  valve 

2

, on cold port of valve and run to a

  drain. 

Detail “A”

4.  Slowly open ball valve 

2

, allowing the zone to

  purge any air in the line.

PURGING ZONE:

Manual #7802-122-000

Revised: 01/12/2022  E

R

E

T

U

R

N

T

O

H

E

A

T

E

R

2

1

3

4

9

8

7

3

4

2

6

5

L INE FRO

M F IXTU

RES

R

E

T

U

R

N

TO

H

E

A

T

E

R

L INE FRO

M F IXTU

RES

R

E

T

U

R

N

TO

H

E

A

T

E

R

L INE

FRO

M F

IXTU

RES

The Cold Water Port must be piped with either the 
optional Cap, or Cap by others, or optional 
lockable Ball Valve, or Ball Valve by others. Failure 
to do so will result in water damage and will not be 
covered under warranty by Acorn Controls or 
Acorn Engineering Company.

!

IMPORTANT

Reviews: