Acmeda PIUMA Manual Download Page 5

 

Page

 

3.1

 

piuma

 

Installation

 

Manual

 

|

 

December

 

2014

 

©

 

Copyright

 

2014

 

|

 

All

 

Rights

 

Reserved

 

Acmeda

 

(International

 

Group)

 

 

SECTION

 

3

 

 

REGULATING

 

THE

 

AWNING

 

 

Once

 

the

 

awning

 

has

 

been

 

assembled,

 

to

 

check

 

that

 

all

 

the

 

components

 

are

 

correctly

 

fitted

 

you

 

must:

 

 

Complete

 

2

3

 

test

 

cycles

 

of

 

opening/closing

 

the

 

awning.

 

 

Regulate

 

any

 

components

 

that

 

prevent

 

the

 

correct

 

and

 

unimpeded

 

opening

 

and

 

closing

 

movement

 

of

 

the

 

awning.

 

 

STEP

 

1

 ‐ 

DESCRIPTION

 

Ensure

 

that

 

there

 

are

 

no

 

persons,

 

animals

 

or

 

things

 

in

 

the

 

vicinity

 

while

 

opening/closing

 

the

 

awning.

 

I.

 

Slacken

 

the

 

side

 

screw

 

(A)of

 

the

 

folding

 

arm

 

support

 

using

 

and

 

allen

 

key

 

10.

 

II.

 

To

 

increase

 

the

 

inclination,

 

slacken

 

the

 

socket

 

head

 

screw

 

(B)

 

using

 

allen

 

key

 

8.

 

III.

 

To

 

decrease

 

the

 

inclination,

 

tighten

 

the

 

socket

head

 

screw,

 

raising

 

the

 

front

 

terminal

 

bar.

 

 

After

 

regulation,

 

check

 

that

 

the

 

front

 

terminal

 

bar

 

is

 

perfectly

 

horizontal.

 

 

 

DESCRIPTION

 

After

 

regulation,

 

firmly

 

tighten

 

the

 

side

 

screw.

 

With

 

the

 

awning

 

almost

 

closed,

 

check

 

that

 

the

 

arms

 

are

 

parallel.

 

If

 

they

 

are

 

not

 

parallel,

 

tighten

 

or

 

slacken

 

the

 

dowel

 

in

 

the

 

lever

 

using

 

Allen

 

key

 

3,

 

accompanying

 

the

 

arm.

 

 

 

 

 

Summary of Contents for PIUMA

Page 1: ...PIUMA INSTALLATION MANUAL December 2014 ...

Page 2: ...staller is responsible to ensure that the devises used to anchor the product to the supporting structure are suitable for the application SAFETY INFORMATION Ensure Job Safety Analysis Safe Work Method Statement is completed and actions to reduce risks are implemented Ensure that electrical works are done only by a LICENSED ELECTRICIAN DO NOT modify any of the components of this system PERSONNEL RE...

Page 3: ...vers are required Jaw Pliers detail if any alternate pliers are required Scissors Stapler Punch tool template Measuring Tape Pencil Etc ADDITIONAL ITEMS REQUIRED NOT SUPPLIED To assemble a piuma the following non stocked items are required Staples specify size if applicable Fabric Spline Specify spline sizes and type Screw Specify screw type head type size length and material Rivet Specify head ty...

Page 4: ... brackets B positioned previously Check distance required to install square bar to brackets Fig 1 1 1 2 STEP 3 TEST AWNING After having checked the tightness of the front terminal bar connecting screws remove the safety bands and straps from the arms and open the awning Fix the fabric to the terminal bar to prevent is from sliding Use screws between the spline and the extrusion Open and close the ...

Page 5: ...re are no persons animals or things in the vicinity while opening closing the awning I Slacken the side screw A of the folding arm support using and allen key 10 II To increase the inclination slacken the socket head screw B using allen key 8 III To decrease the inclination tighten the socket head screw raising the front terminal bar After regulation check that the front terminal bar is perfectly ...

Page 6: ...s Reserved Acmeda International Group SECTION 4 REMOVING THE AWNING The awning must be taken down by qualified personnel The awning must be taken down when closed I Remove the screws from the brackets that lock the square bar in place and remove the awning from the brackets ...

Reviews: