STEP 2.1:
Attach the bed rail (F) to headboard leg (N).
STEP 2.2:
Tighten screw on headboard leg (N) by using L key M5 (5) & repeat the same step on footboard leg (P).
STEP 2.3:
Attach the drawer slat (G) each to a drawer slat support (H) & fix with drawer slat support stopper (I).
STEP 2.4:
Fix the drawer slat (G) to bed rail (F) with CSK M4 x 32mm (10).
STEP 2.5:
Move 'T' runner at footboard panel (B) to drawer slat (G).
Page 3 of 6
A
SSEMBLY INSTRUCTION
S
'T' Runner
STEP 2.5
G
B
I
G
STEP 2.4
10
STEP 2.1
F
STEP 2.2
F
5
STEP 2.3
N
P
B
'T' Runner
G
H
F