S G M 1 4 3 0 - B S m a r t M e t e r P o l y p h a s e U s e r M a n u a l – S M E T S 2
v
• trained in rendering first aid.
Any work on or near energized meters, meter sockets, or other metering
equipment presents the danger of electrical shock. All work on these products
must be performed by qualified industrial electricians and metering specialists
only. All work must be done in accordance with local utility safety practices and
procedures.
Summary of Contents for SGM1430-B
Page 1: ...SGM1430 B Smart Meter Polyphase User Manual SMETS2 Y20995 TUM Revision A www Aclara com...
Page 2: ......
Page 4: ...ii S G M 1 4 3 0 B S m a r t M e t e r P o l y p h a s e U s e r M a n u a l S M E T S 2...
Page 8: ...vi S G M 1 4 3 0 B S m a r t M e t e r P o l y p h a s e U s e r M a n u a l S M E T S 2...