
BLOWER CHAUFFANT
BLOWER WITH HEATER
6
3.
INSTALLATION AND USE
•
Installation must be done by professional qualified persons.
•
Nozzles installation. The number of nozzles installed is no les s than required minimum nozzles.
•
Air-distibuting pipe, c heck valve and draining valve must be connected by Heat-Resisting tub e. The installation of check
valve should be higher than regular water leveI of bathtub. (Fig. I)
•
Use the flexible tube to link the nozzles and air-di stributing pipe, and fix the flexible tube by clip. Then the connection pipe
must be fastened.
•
After connection between air outlet and air pipe, take use of glue to fasten and seal.
•
The connect pipe of air blower pump must use resist heat pipe.
•
Properly heat-re sis t pipes must be installed on pump air-inlet Out-inlet and enough length should be guarded to prevent
from the electric shock and moving parts hazard. Pumps must at least be kept away from others parts and bath/spa 20 mm.
Protecting electric. Shock must be checked in final appliance.
•
The heater is to be installed so that switches and other control cannot be touched by person in the pool.
Fig. 1