background image

Manual opener

Automatic opener

GM80001

2

5. Base anchor brackets are included as standard with expanding bolts to ensure a secure 
    fixing into concrete or paving. Alternatively, you can use the brackets to fix into a 
    timber base with wood screws (not provided).

Expansion bolt 
in concrete

6. Manual window handles are included as standard with the roof vents. If required, 
    automatic roof vent openers are available as an inexpensive optional extra.

 

 

8. Each Polycarbonate Panel comes with UV protected properties. Therefore,please ensure 

the white film is facing outward towards the sun (remove the film before installing into 
aluminium channel).

7. Please ensure the roof vents are not installed into the end roof bays of the greenhouse 

   as this is where you need the bracing.

4. The greenhouse can be easily extended at any stage in 1.4m long sections as detailed in 

   the table of Front Page.

Steel bar/Lawn land

Summary of Contents for 2534100

Page 1: ...cm H EXTENSION SIZE 4 6 1 8 L x 6 10 3 4 W x 6 10 3 4 H 137 5cm L x 210cm W x 210cm H PLEASE READ INSTRUCTIONS CAREFULLY BEFORE ASSEMBLY Item No Model No Packing List SH7 SH7 ext 2534100 2534110 AL No...

Page 2: ...ONTENTS 1 Assembly Advice Page 1 2 Product Features Page 1 2 3 Parts List Page 3 5 7 Framework Panel Assembly Page 12 23 6 Roof Vent Assembly Page 11 4 Base Assembly Page 6 8 5 Door Assembly Page 9 10...

Page 3: ...greenhouse 5 Keep the roof and gutter clear of snow dirt leaves Allowing snow to build up on the roof may damage the product 6 Unlike steel if the paint finish is scratched this will not harm the alu...

Page 4: ...ents If required automatic roof vent openers are available as an inexpensive optional extra 8 Each Polycarbonate Panel comes with UV protected properties Therefore please ensure the white film is faci...

Page 5: ...03 M8X60 L04B 3 L05A 2 L01A L03C 1 2 L03D 1 L08A 1 L01B 1 L01C 1 L02A 4 L06A 1 L07A 2 L02B 4 L08A 2 W06 2 W08 2 L02B L05C 4 L05D 4 L09A 2 L15A 2 L19 4 L20 2 L21 2 W04 4 76 76 40 4 L04B 2 M01 M6 S01 M6...

Page 6: ...2 Y9 Y1 2 Y2 5 Y3 1 Y4 2 Y5 1 4 Y6 6 Y7 Y11 2 Y10 2 Y7 Y9 Y7 Y9 4 Y6 Y6 Y6 Y6 Y2 Y4 Y5 Y1 Y2 Y11 Y11 Y2 Y4 Y3 Y1 Y2 Y2 Y7 Y7 Y6 Y6 PC No 1 PC No 1 SH7...

Page 7: ...2 L04B 2 L10A 2 L08D 2 W02 2 L10B 2 L10C 2 C G H K 2 2 1 2 J04 J05 J06 2 2 1 PART NO QTY PART NO QTY Y7 Y9 2 Y9 2 Y6 4 Y7 Y10 2 PC N0 2 5 Y6 Y6 Y7 Y9 Y6 Y6 EXT 2 Sections AU Box No 2 ALU Box No 2 EXT...

Page 8: ...a b Expansion bolt in concrete a b a b Steel bar Lawn land a b 6 It is essential the dimensions a b are the same to ensure the base is square...

Page 9: ...7 W05 S03 W05 W05 Back W05 Front Assembly This shows a layout for W05 s positions where it is placed in the middle of PC panel for each section...

Page 10: ...8 6 8950 2 2958 8 5268 6 6550 1 7795 9126 2881 6 5196 9 6481 7862 1 9191 5 4046 6 3917 7 Dim Model 2092 2 2092 2 2092 2 2092 2 2092 2 SH7 W Outer Width of Base Profiles L Outer Length of Base Profiles...

Page 11: ...2 4 5 6 9 3 L05G 2 QTY L18A L16A 1 2 NO PART L18B 2 L17 1 L16B 1 J 8 4 4 L16C 1 Y11 2 L16B J Z01 L16B J Z01 L18A J Z01 L18B L17 L17 L18A J Z01 L18B 2 1 L17 3 L18A Y11 L05G L16B 5 L18B 4 6 16 Z01 4X14D...

Page 12: ...Door2 Assembly 10 7 8 9 10 11 12 7 L18B 8 L18A Y11 L05G L16A 10 9 11 L16C 12 L16A J Z01 L18B L18A J Z01 L18B L16A J Z01 L16C L18A J Z01 L16C...

Page 13: ...Roof Vent Assembly L15A L20 L19 L21 Z01 Y10 L19 Z01 Z01 Z01 QTY NO PART L15A 1 L19 2 L20 1 L21 1 W06 4 2 2 4 S02 M6X16 M01 M6 Z02 4X16D Z04 4X10 6 11...

Page 14: ...L08A L08A L08A A B J03R L J03R L A B 1 1 1 2 L08A L08A J03R L A B L08A L08A A B J03R L 2 2 12 make sure you pay close attention to the direction of the pins must connect all plastic parts J03 R L bef...

Page 15: ...L01A L01A L03C L03D 13 1 1 2 3 4 L01A L08A L08A L03C L08A L03D L08A L01A L08A L08A...

Page 16: ...Y1 Y3 Y4 Y2 Y2 Y2 L04B L04B L04B 1 2 3 4 1 2 3 4 L01A L01A L03C L03D L04B L04B L04B L04B L04B L04B 14...

Page 17: ...C W01 L01C L03D 2 4 W01 6 7 1 4 5 2 3 6 7 6 7 L05A L05A L01B L01C L05A L05A Note please insert upper roof supports but do not lock in place until you have aligned the poly carbonate inserts make sure...

Page 18: ...16 L01D L01A L03E L03F 1 2 3 4 L01D L08A L08A L03E L08A L03F L08A L01A L08A L08A 1 2 3 4...

Page 19: ...17 1 1 2 3 4 4 3 2 L04B L04A L04B L04A L04B L04B L04B Y2 Y2 Y1 Y4 Y5...

Page 20: ...2 L01B L03F W01 L01C L03E W01 4 5 6 7 D L05A L05A L05A L05A E L07 3 1 F L01B L01C 1 1 3 2 3 2 L07A L06A L07A 5 Note please insert upper roof supports but do not lock in place until you have aligned th...

Page 21: ...19 L05D L05C L05D L06A L05C L08C 4 5 1 2 3 L06A L02B L02A L07A L02B 1 4 1 4 5 2 2 5 3 3...

Page 22: ...20 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y9...

Page 23: ...21 L06 Roof Vent Assembly Z01 1 S01 4PCS W08 L04B 2 L04B W04 3 Z03 Z03 W06 JXX8001 Z03 Z03 L04B L04B S01 M01 L15A 3 3 2 1...

Page 24: ...22 1 2 4 5 3 4 1 1 1 1 2 3 5...

Page 25: ...Z03 L09A 1 J02R L J07R L J08 Z01 23 1 1 Use L09A to cover the edges of all Y9 after all roof PC panels are fixed in place then tighten them with Z03...

Reviews: