background image

                                                                    ACER XV272K V3 

 

11 

 

 

4.2 Assembly Procedures 

Preparation before assemble: 

1. 

Clean the room for work 

2. 

Identify the area for material 

3. 

Prepare the implement, equipment, materials as bellow

 

1) 

working table 

2) 

Screw-driver 

3) 

Knife 

4) 

glove 

5) 

cleaning 

cloth ESD 
protection 
S1 
Assemble the  middle frame 

A.  Input the LCD on the pallet 
B.  Take one middle frame and put it on the back side of panel 
C.  Load the middle frame on the panel 

 

 

 
 
 
 
 
 
 
 
 

S2 
Assemble the mainboard and power 
board of shielding 

A.  Assemble LVDS wire , Keypad wire and backlight wire on the 

mainboard  

B.  Assemble the power wire from mainboard to power board 
C.  Put the mainboard and power board into the shielding and load screws 

on the shielding 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

Put the bottom side of panel into middle frame, 

let the backlight connector on the left side of 

the middle frame

 

Assemble the LVDS wire, Key 
pad wire and back light wire  

Connect the mainboard 
and power board with wire 

Put the mainboard and power 

board into the shielding 

Loading six screws of 

mainboard and power board 

Summary of Contents for XV272K V3

Page 1: ...ACER XV272K V3 1 ACER_XV272K V3 _SM20230815V1 Acer Monitor XV272K V3 LIFECYCLE EXTENSION GUIDE...

Page 2: ...agram 6 3 Mechanical Instruction 7 4 Assembly and Disassembly SOP 8 5 Troubleshooting 14 6 FRU List 16 Safety Notice Any person attempting to service this chassis must familiarize with the chassis and...

Page 3: ...pairing method may damage equipment or products It is recommended that service engineers should have repairing knowledge experience as well as appropriate product training per new model before perform...

Page 4: ...ACER XV272K V3 5 1 Exploded Diagram 1 1 Product Exploded Diagram 1 2 BOM LIST...

Page 5: ...ACER XV272K V3 6 2 Wiring connectivity diagram...

Page 6: ...he type and size of the tools that would typically can be used to disassemble the product to a point where components and materials requiring selective treatment can be removed Tool Description workin...

Page 7: ...Screw driver 3 knife 4 glove 5 cleaning cloth 6 ESD protection S1 Disassemble the base stand A Place the machine face down on the clean flat washers first B Remove the screw from the bracket and take...

Page 8: ...off S4 Remove the main board and power board and pull out the wire from board A Using the screw driver to remove the screw which fixing the main board and power board to shielding B Remove the main b...

Page 9: ...ame on the panel S2 Assemble the mainboard and power board of shielding A Assemble LVDS wire Keypad wire and backlight wire on the mainboard B Assemble the power wire from mainboard to power board C P...

Page 10: ...semble the LVDS line to panel with jig C Fix the shielding D Assemble the backlight to panel E Fixed backlight and speaker wire with tape Assemble right speaker Assemble left speaker Connect the wire...

Page 11: ...d through bottom left right and top side S6 Loading back cover screw and assemble stand and base A Loading three back cover with screw driver B Assemble the stand into the back cover C Assemble the ba...

Page 12: ...ACER XV272K V3 15 5 Troubleshooting...

Page 13: ...tever reasons a part number change is made it will not be noted on the printed Service Guide For AUTHORIZED SERVICE PROVIDERS your office may have a DIFFERENT part number code from those given in the...

Reviews: