Chapter 3
36
3. Assemble Interlock Swtich / Thermal Switch / LVPS
No
Procedure
Photo
1
1. Screw 2 screws to
assemble the Interlock Switch.
2. Screw 1 screw to assemble
the Assy Thermal Switch
Board.
2
1. Screw 4 screws
2. Screw 1 screw in the
grounding wire.
3. Plug 1 connector in the
Interlock Swtich to assemble
the LVPS.
1
2
3
1
2
Summary of Contents for XD1170D
Page 81: ...73 Chapter 5 PD120 Assy Engine Bottom Cover Module ...
Page 88: ...Chapter 5 Appendix A Exploded Overview D C XD1170D 80 ...
Page 92: ...Chapter 5 ASSY BOTTOM HOUSING MODULE XD1170D 84 ...
Page 94: ...Chapter 5 ASSY ENGINE TOP COVER MODULE XD1170D 86 ...
Page 96: ...Chapter 5 XD1170D PROJECTION DISPLAY PROJECTOR ASSY SYSTEM FAN 80x25 MODULE 88 ...
Page 98: ...Chapter 5 Appendix A Exploded Overview D C XD1270D 89 ...
Page 101: ...Chapter 5 ASSY BOTTOM HOUSING MODULE XD1270D 92 ...
Page 103: ...Chapter 5 ASSY BOTTOM BASE MODULE XD1270D 94 ...
Page 109: ...Chapter 5 ASSY ENGINE TOP COVER MODULE XD1270D 100 ...
Page 111: ...Chapter 5 ASSY ENGINE BOTTOM COVER MODULE XD1270D 102 ...
Page 119: ...Chapter 5 XD1270D PROJECTION DISPLAY PROJECTOR 110 ...