X1161/X1261/X1161A/X1161N/X110/H5360
Confidential
2-26
2-36 Assemble Top Shielding
1. Screw 5 screws (as red circle) to
assemble the Top Shielding.
Note: Avoid pressuring the Speaker cable (as
yellow square) when you assemble the
Top shielding. (for X1261/H5360)
2-37 Assemble Top Cover
Moudle
1. Assemble the Top Cover Module.
Note: Take care the 6 tenons (as green
square) when you assemble the Top
Cover.
2. Screw 2 screws (as red circle) on the
Bottom Cover.
Summary of Contents for X110 Series
Page 18: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential 1 12 Remote Control and Control Panel Layout...
Page 22: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential 1 16 System Block Diagram for X1261...
Page 23: ...Confidential 1 17 X1161 X1261 X1161A X1161N X110 H5360 System Block Diagram for H5360...
Page 24: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential 1 18 Bottom Cover Dimension...
Page 85: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential III D C X1261 25...
Page 87: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential I D X1161...
Page 90: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential VIII IO MODULE X1161...
Page 92: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential IO MODULE X1261...
Page 95: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential XIII One Fan Module...
Page 98: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential XVI Assy Engine Module...
Page 102: ...X1161 X1261 X1161A X1161N X110 H5360 Confidential XX A K...